TCM Chapter 3 Exam Study Guide
The MPS is constrained by: - Answer all
Which of the following is (are) true about time fences in a master production schedule
system? - Answer I. Changes far out in the planning horizon can be made with little or no
cost to manufacturing.
II. In the "frozen zone," capacity and materials are committed to specific orders.
Which of the following are objectives of an MPS? - Answer Maintain the desired level of
customer service.
The functions of a master production schedule are to - Answer II. Plan capacity
requirements
III. Keep priorities valid
The information needed to develop a master production schedule will be got from: -
Answer The production plan
The forecast of individual end items
Inventory levels for individual end items
The MPS is a vital link in the production planning system because it: - Answer I. Keeps
priorities valid.
II. Forms the basis for determining the capacity needed.
III. Is input to the material requirements plan.
If there are customer orders the projected available is based on: - Answer the greater of
forecast demand and customer orders
In an assemble-to-order company, at which level should master scheduling take place? -
Answer The components/subassembly level
The process of checking the MPS against available capacity is called: - Answer
Rough-cut capacity planning
The PAB is calculated in which way for periods after the demand time fence? - Answer
PAB = prior period PAB or on-hand balance + MPS - customer orders
Which of the following is a contract between manufacturing and marketing? - Answer
master schedule
Which of the following is the term applied to a master schedule for a purchased item? -
Answer purchase order
The MPS is constrained by: - Answer all
Which of the following is (are) true about time fences in a master production schedule
system? - Answer I. Changes far out in the planning horizon can be made with little or no
cost to manufacturing.
II. In the "frozen zone," capacity and materials are committed to specific orders.
Which of the following are objectives of an MPS? - Answer Maintain the desired level of
customer service.
The functions of a master production schedule are to - Answer II. Plan capacity
requirements
III. Keep priorities valid
The information needed to develop a master production schedule will be got from: -
Answer The production plan
The forecast of individual end items
Inventory levels for individual end items
The MPS is a vital link in the production planning system because it: - Answer I. Keeps
priorities valid.
II. Forms the basis for determining the capacity needed.
III. Is input to the material requirements plan.
If there are customer orders the projected available is based on: - Answer the greater of
forecast demand and customer orders
In an assemble-to-order company, at which level should master scheduling take place? -
Answer The components/subassembly level
The process of checking the MPS against available capacity is called: - Answer
Rough-cut capacity planning
The PAB is calculated in which way for periods after the demand time fence? - Answer
PAB = prior period PAB or on-hand balance + MPS - customer orders
Which of the following is a contract between manufacturing and marketing? - Answer
master schedule
Which of the following is the term applied to a master schedule for a purchased item? -
Answer purchase order