• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

TCM Chapter 3 Exam Study Guide

Document preview thumbnail
Preview 1 out of 2 pages

TCM Chapter 3 Exam Study Guide ...

Content preview

TCM Chapter 3 Exam Study Guide
The MPS is constrained by: - Answer all

Which of the following is (are) true about time fences in a master production schedule
system? - Answer I. Changes far out in the planning horizon can be made with little or no
cost to manufacturing.

II. In the "frozen zone," capacity and materials are committed to specific orders.

Which of the following are objectives of an MPS? - Answer Maintain the desired level of
customer service.

The functions of a master production schedule are to - Answer II. Plan capacity
requirements

III. Keep priorities valid

The information needed to develop a master production schedule will be got from: -
Answer The production plan

The forecast of individual end items

Inventory levels for individual end items

The MPS is a vital link in the production planning system because it: - Answer I. Keeps
priorities valid.

II. Forms the basis for determining the capacity needed.

III. Is input to the material requirements plan.

If there are customer orders the projected available is based on: - Answer the greater of
forecast demand and customer orders

In an assemble-to-order company, at which level should master scheduling take place? -
Answer The components/subassembly level

The process of checking the MPS against available capacity is called: - Answer
Rough-cut capacity planning

The PAB is calculated in which way for periods after the demand time fence? - Answer
PAB = prior period PAB or on-hand balance + MPS - customer orders

Which of the following is a contract between manufacturing and marketing? - Answer
master schedule

Which of the following is the term applied to a master schedule for a purchased item? -
Answer purchase order

Document information

Uploaded on
August 23, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Flat
3.6
(5)
Sold
41
Followers
5
Items
2117
Last sold
5 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions