NERC Test Questions With 100%Verified AnswersA+GRADED(Guaranteed Sucess) What percentage of load gives a 1 Hz change in an island condition? - correct answer...6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? - correct answer...Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? - correct answer...Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? - correct answer...All load breakers should be opened, load should be restored in a controlled manner not to exceed 5% of current available gen What's the point of COM-001? - correct answer...Each TO, BA, RC and NERCNet Use Orgs need to have good comms Where do they need to have comms? - correct answer...Internal, Between RC, TO and BA, Other RC, TO, BA and authorities Where applicable comms should be ______ and _______ routed. - correct answer...Redundant and Diversely routed, just in case something fails How do we know comms will be good? - correct answer...They will manage, alarm, test and/or actively monitor, especially emergency comm facilities and equipment (non-routine equipment) When can languages other than English be used? - correct answer...Only for internal operation, Operation of the BES requires comms in English What is required so operation during a loss of comms will be ensured? - correct answer...Written operating instructions and procedures What is the point of COM-002? - correct answer...Ensure BA, TO, GO, and RC have comms and capability to use them for addressing emergency and that operators are trained to use them Who should a BA or TO notify if they are aware of any condition that could threaten area reliability or when shedding load? - correct answer...Notify their RC and any other potentially affected BA or TO How should directives be issued by an RC, TO or BA? - correct answer...In a clear, concise and definitive manner, using 3 part(way) communications Who is required to create a blackstart restoration plan? Who approves it? - correct answer...Transmission Operators; Its RC When is the blackstart condition finished? - correct answer...When the choice of the next load to be restored is not driven by frequency and voltage control Who directs the procedure for restoring interconnection between Tos? - correct answer...RC What must be done prior to implementing changes in a restoration plan? - correct answer...The parties invloved must be told of changes to their role and specific tasks prior to implementation. How often must the plan be confirmed given no changes were made? - correct answer...TO annually review the plan and report to RC After a system modification is made, how long does the TO have to update restoration plans? - correct answer...90 days Where is a copy of the restoration plan required to be kept? - correct answer...Main and backup control rooms What must be done on the restoration plan every five years? - correct answer...Analyze the plan through actual events, steady state and dynamic simulations or testing that the plan can work as intended. How often must a Blackstart Resource verify it can meet real and reactive power requirements of its cranking path and intial load? - correct answer...Every 5 years How often must the location of loads required to control voltage and Hz in a blackstart be verified within operating limits? - correct answer...Every 5 years How often is the capability of generating resources required to control voltage and Hz in a blackstart condition verified? - correct answer...Every 5 years What should a TO use if the restoration plan cannot be executed? - correct answer...Use its restoration strategies Under what conditions can a TO resynchronize with its neighboring TO? - correct answer...Only with RC approval or with the established procedures of the RC What is the point of Blackstart Resource testing? - correct answer...To ensure the resource is capable of me4eting the requirements of the restoration plan How often must a Blackstart Resource be verified at a minimum? - correct answer...Once every 3 years Name two requirements when testing a Blackstart Resource: - correct answer...Ability to start with no BES support and remain energized without the rest of the system; The ability to energize a bus What is the frequency that system restoration training for operators is required? - correct answer...Annually What is the purpose of annual operator system restoration training? - correct answer...To assure proper execution of its restoration plan Name 4 things required in annual operator system restoration training: - correct answer...System restoration plan including coordination with RC and GO; Restoration Priorities; Building of cranking paths; Synchronizng How often and how much training is required for field switching personnel who are included in the system restoration plan? - correct answer...Minimum 2 hrs every 2 years When must a TO or GO participate in RC restoration drills, exercises or simulations? - correct answer...As requested by the RC What is a Blackstart Resource Agreement? - correct answer...This is an agreement between a TO and GO that includes the terms and conditions of the use of the Blackstart Unit; e.g. procedures, protocols, testing requirements What is required by each GO for their Blackstart Resources? - correct answer...Documented procuedures for starting each resource and energizing a bus Who must a GO notify if a Blackstart Resource ability to perform its function is changed? - correct answer...The TO who holds the agreement What is the time requirement for a GO to notify its TO when a Blackstart Resource capabilities are compromised? - correct answer...24 Hours Who is required to perform the agreed upon testing of a Blackstart Resource? - correct answer...The GO

Show more Read less
Institution
NERC
Course
NERC










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
August 14, 2024
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC Test Questions With 100%Verified
AnswersA+GRADED(Guaranteed
Sucess)
What percentage of load gives a 1 Hz change in an island condition? - correct
answer...✔✔6-10% (Think 6-10 day island vacation)

If ACE is Zero but system Hz is off, what should a system operator do? - correct
answer...✔✔Nothing! ACE bias and interchange schedule will improve frequency

If ACE is Zero, why not adjust generation to help frequency? - correct answer...✔✔
Could overload equipment, this is a NERC violation

When restoring from blackout condition, what should be done with load? - correct
answer...✔✔All load breakers should be opened, load should be restored in a
controlled manner not to exceed 5% of current available gen

What's the point of COM-001? - correct answer...✔✔Each TO, BA, RC and NERCNet
Use Orgs need to have good comms

Where do they need to have comms? - correct answer...✔✔Internal, Between RC, TO
and BA, Other RC, TO, BA and authorities

Where applicable comms should be ______ and _______ routed. - correct answer...✔
✔Redundant and Diversely routed, just in case something fails

How do we know comms will be good? - correct answer...✔✔They will manage, alarm,
test and/or actively monitor, especially emergency comm facilities and equipment (non-
routine equipment)

When can languages other than English be used? - correct answer...✔✔Only for
internal operation, Operation of the BES requires comms in English

What is required so operation during a loss of comms will be ensured? - correct
answer...✔✔Written operating instructions and procedures

What is the point of COM-002? - correct answer...✔✔Ensure BA, TO, GO, and RC
have comms and capability to use them for addressing emergency and that operators
are trained to use them




AGRADESOLUTIONS

,Who should a BA or TO notify if they are aware of any condition that could threaten
area reliability or when shedding load? - correct answer...✔✔Notify their RC and any
other potentially affected BA or TO

How should directives be issued by an RC, TO or BA? - correct answer...✔✔In a clear,
concise and definitive manner, using 3 part(way) communications

Who is required to create a blackstart restoration plan? Who approves it? - correct
answer...✔✔Transmission Operators; Its RC

When is the blackstart condition finished? - correct answer...✔✔When the choice of the
next load to be restored is not driven by frequency and voltage control

Who directs the procedure for restoring interconnection between Tos? - correct
answer...✔✔RC

What must be done prior to implementing changes in a restoration plan? - correct
answer...✔✔The parties invloved must be told of changes to their role and specific
tasks prior to implementation.

How often must the plan be confirmed given no changes were made? - correct
answer...✔✔TO annually review the plan and report to RC

After a system modification is made, how long does the TO have to update restoration
plans? - correct answer...✔✔90 days

Where is a copy of the restoration plan required to be kept? - correct answer...✔✔Main
and backup control rooms

What must be done on the restoration plan every five years? - correct answer...✔✔
Analyze the plan through actual events, steady state and dynamic simulations or testing
that the plan can work as intended.

How often must a Blackstart Resource verify it can meet real and reactive power
requirements of its cranking path and intial load? - correct answer...✔✔Every 5 years

How often must the location of loads required to control voltage and Hz in a blackstart
be verified within operating limits? - correct answer...✔✔Every 5 years

How often is the capability of generating resources required to control voltage and Hz in
a blackstart condition verified? - correct answer...✔✔Every 5 years

What should a TO use if the restoration plan cannot be executed? - correct answer...✔
✔Use its restoration strategies



AGRADESOLUTIONS

, Under what conditions can a TO resynchronize with its neighboring TO? - correct
answer...✔✔Only with RC approval or with the established procedures of the RC

What is the point of Blackstart Resource testing? - correct answer...✔✔To ensure the
resource is capable of me4eting the requirements of the restoration plan

How often must a Blackstart Resource be verified at a minimum? - correct answer...✔
✔Once every 3 years

Name two requirements when testing a Blackstart Resource: - correct answer...✔✔
Ability to start with no BES support and remain energized without the rest of the system;
The ability to energize a bus

What is the frequency that system restoration training for operators is required? -
correct answer...✔✔Annually

What is the purpose of annual operator system restoration training? - correct answer...
✔✔To assure proper execution of its restoration plan

Name 4 things required in annual operator system restoration training: - correct
answer...✔✔System restoration plan including coordination with RC and GO;
Restoration Priorities; Building of cranking paths; Synchronizng

How often and how much training is required for field switching personnel who are
included in the system restoration plan? - correct answer...✔✔Minimum 2 hrs every 2
years

When must a TO or GO participate in RC restoration drills, exercises or simulations? -
correct answer...✔✔As requested by the RC

What is a Blackstart Resource Agreement? - correct answer...✔✔This is an agreement
between a TO and GO that includes the terms and conditions of the use of the
Blackstart Unit; e.g. procedures, protocols, testing requirements

What is required by each GO for their Blackstart Resources? - correct answer...✔✔
Documented procuedures for starting each resource and energizing a bus

Who must a GO notify if a Blackstart Resource ability to perform its function is
changed? - correct answer...✔✔The TO who holds the agreement

What is the time requirement for a GO to notify its TO when a Blackstart Resource
capabilities are compromised? - correct answer...✔✔24 Hours

Who is required to perform the agreed upon testing of a Blackstart Resource? - correct
answer...✔✔The GO


AGRADESOLUTIONS

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
agradesolutions Oxford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
155
Member since
1 year
Number of followers
3
Documents
1611
Last sold
2 hours ago

2.9

21 reviews

5
6
4
2
3
4
2
2
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions