• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

Amber Book- Professional ( Civil Engineering) Practice (Pcm & Pjm) Study Guide With Complete Solution!!

Document preview thumbnail
Preview 3 out of 21 pages

AMBER BOOK- PROFESSIONAL ( CIVIL ENGINEERING) PRACTICE (PCM & PJM) STUDY GUIDE WITH COMPLETE SOLUTION!!

Content preview

AMBER BOOK- PROFESSIONAL ( CIVIL ENGINEERING)
PRACTICE (PCM & PJM) STUDY GUIDE WITH COMPLETE
SOLUTION!!
A warranty
Answers :Which poses the most risk for the architect if it is included in his
contract?
Found in a contract prepared by an owner, which of these phrases may void
coverage by the architect's professional liability


Answers :Hold harmless, As required, Indemnification, As necessary
Which building typology is most prone to litigation?


Answers :Condos are particularly risky because occupants have high expectations
and they have a condo association: There are dues, a budget, and often lawyer
living in the building, and serving on the condo board. If there is a problem with
construction, there is an entity already in place to file a lawsuit.
The architect makes a change to the drawings after they have gone out to bid, but
before a contractor has been selected. This is called:


Answers :An Addendum
Which of the following will typically enter a contract with the architect directly?


Answers :Landscape architect,
Civil engineer,
Lighting consultant,
Mechanical/electrical/plumbing (MEP)
Which of the following will typically enter a contract with the architect directly?

,Answers :Typically, the audio/visual consultant, cost estimator, lighting consultant,
and code consultant will enter into a contract directly with the architect.


The Architect is then responsible for the communication, coordination, and
administration of those sub-consultants.


The owner is responsible for the site, contracting both the permitting consultant
and the surveyor.
What are the responsibilities of a geotechnical engineer, but not of a civil engineer?


Answers :Subsurface soil analysis. Geotechnical engineers are a subset of civil
engineers, typically hired by the owner of a site.
Automobile liability insurance, Professional liability insurance, General liability
insurance, Workers compensation insurance


Answers :Which of the following insurance types may be required on AIA
Document B101 (contract between the owner and architect)?
General liability insurance


Answers :Is a basic insurance that covers property damage and injury claims
against the firm, usually with dollar limits on claims or an aggregate limit. It is
sometimes required by the Landlord and covers both legitimate and fraudulent
claims.
Intellectual property insurance


Answers :covers an architect if someone else claims copyright infringement.
Worker's compensation insurance

, Answers :covers a worker who is injured on the job. It provides wage replacement
and medical care cost in exchange for the employee waiving his right to sue the
firm
Intellectual property insurance


Answers :covers an architect if someone else claims copyright infringement.
Business interruption insurance


Answers :pays the architect for expenses and loss of profits if work is interrupted
by something like a fire or flood.
Employment practice liability insurance protects the firm from wrongful
termination lawsuits.


Answers :Which type of insurance protects your firm in a wrongful termination
suit?
Deductible


Answers :You are found negligent for an error in your drawings and ordered to pay
the plaintiff S50.000, Forty thousand dollars of that sum is paid by your coverage,
but everything up to the first $10,000 must be paid by your firm. Your portion is
called "...."
Premium


Answers :is what you pay every month or every six months as a bill to be insured.
Which is the architect responsible for?


Answers :An architect is responsible for Reviewing the contractor's invoice to the
owner. An architect is the representative of the owner and is supposed to act in his
interest, so each month when the contractor sends the owner his invoice, the

Document information

Uploaded on
August 11, 2024
Number of pages
21
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DistinctionDesk
3.5
(41)
Sold
227
Followers
117
Items
2419
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions