Exam (elaborations)

Interconnection reliability operations and coordination with verified solutions

Document preview thumbnail
Preview 3 out of 16 pages

Interconnection reliability operations and coordination with verified solutions

Content preview

Interconnection reliability operations
and coordination

IRO - correct answer ✔✔Interconnection reliability operations



The reliability coordinator is responsible for - correct answer ✔✔the reliable operation of the bulk
electric system



IRO -001 - correct answer ✔✔authority



IRO - 003 - correct answer ✔✔Wide area view



The RC shall know the current status of all _______ in their whose failure, degradation or disconnection
could result in a system operating limit or an interconnection reliability operating limit violation - correct
answer ✔✔



Since events in one part of the system can influence operations in all other parts of the system, the RC is
required to monitor and determine any potential SOL and IROL violations - correct answer ✔✔True



Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________. - correct answer
✔✔30 minutes



Reliability Coordinator shall initiate control actions or emergency procedures to relieve the violation
without delay and no longer than ___________. - correct answer ✔✔30 minutes



___________ have the duty to continuously assess transmission reliability and coordinate emergency
operations among the operating entities within the region and across the regional boundaries. - correct
answer ✔✔Reliability Coordinators

,A portion of a Reliability Coordinator Area is experiencing low voltage, what directives should the
Reliability Coordinator give? - correct answer ✔✔Lower transfers across area and increase generation in
area with low voltage



Low voltage is a result of reactive power and losses associated with transferring power to load areas.
Increasing generation in the area with low voltage reduces losses associated with transferring power.



At any time, regardless of prior planned or unplanned events, the Reliability Coordinator should be able
to determine any potential ______________ violations within its Reliability Coordinator Area. - correct
answer ✔✔System Operating Limits (SOL) & Interconnection Reliability Operating Limits (IROL)



The _______ as defined by NERC is the electrical generation resources, transmission lines,
interconnections with neighboring systems, and associated equipment, generally operated at voltages of
100 kilovolts or higher. - correct answer ✔✔Bulk Electric System



Each Reliability Coordinator shall have adequate analysis tools, such as state estimation, contingency
analysis capabilities and ________ to monitor the Bulk Electric System. - correct answer ✔✔wide-area
overview displays



Wide-Area view is required therefore, each Reliability Coordinator shall have adequate analysis tools;
such as, state estimation, pre- and post-contingency analysis capabilities (thermal, stability, and voltage),
and wide-area overview displays.



This is stated in the NERC Standard IRO-002 explicitly and applied in the NERC Standard IRO-003 as the
RC shall monitor a wide area view within its Reliability Coordinator Area and that of neighboring
Reliability Coordinators.



Reliability Coordinators that delegate tasks to other entities shall have formal operating _________ with
each entity to which tasks are delegated. - correct answer ✔✔agreements



If Reliability Coordinator tasks are delegated to other entities, the Reliability Coordinator shall verify that
these tasks are carried out by ___________ operating personnel. - correct answer ✔✔NERC certified

, Reliability Coordinators shall have clear, comprehensive coordination agreements with adjacent
Reliability Coordinators to ensure that System Operating Limit or Interconnection Reliability Operating
Limit violation mitigation requiring actions in adjacent Reliability Coordinator Areas are __________. -
correct answer ✔✔coordinated



Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________. - correct answer
✔✔30 minutes



Reliability Coordinators will have authority to take appropriate emergency actions to mitigate and
maintain the reliable operation of the bulk power transmission system, up to and including
_______________. - correct answer ✔✔shedding load



A portion of a Reliability Coordinator Area is experiencing low voltage, what directives should the
Reliability Coordinator give? - correct answer ✔✔Lower transfers across area and increase generation in
area with low voltage



___________ have the duty to continuously assess transmission reliability and coordinate emergency
operations among the operating entities within the region and across the regional boundaries. - correct
answer ✔✔Reliability Coordinators



Which of the following are required tasks of the Reliability Coordinator for its Reliability Coordinator
Area? - correct answer ✔✔Monitor all Bulk Electric System facilities

Determine potential SOL violations

Determine potential IROL violations



The ____________ function was established to provide entities with a "big picture" view of the system. -
correct answer ✔✔Reliability Coordinator



Each Reliability Coordinator shall have adequate analysis tools, such as state estimation, contingency
analysis capabilities and ________ to monitor the Bulk Electric System. - correct answer ✔✔wide-area
overview displays

Document information

Uploaded on
August 11, 2024
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StuviaExamHub
3.7
(93)
Sold
509
Followers
356
Items
27137
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions