PCI Quality Control Technician Level 1 Chapter 1- 6Study Questions Latest Update Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+

Document preview thumbnail
Preview 3 out of 20 pages

PCI Quality Control Technician Level 1 Chapter 1- 6Study Questions Latest Update Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+

Content preview

PCI Quality Control Technician Level 1 Chapter
1- 6Study Questions Latest Update 2024-2025
Actual Exam Questions and 100% Verified
Correct Answers Guaranteed A+
A commitment to quality starts where in the organization? - CORRECT ANSWER: The
commitment to quality begins with a company's top management.


A number of principal factors in quality control are mentioned in this chapter. Name four
of these. - CORRECT ANSWER: Principal factors in quality control include:
-Management commitment to quality
-Qualified personnel for all stages of design and production
-Testing and inspection of the various materials selected for use as well as product
storage and handling
-Clear and complete shop drawings
-Accurate testing procedures
-Control of dimensions and tolerances
-Proper position of all embedded items
-Correct size and positioning of reinforcing steel
Proper handling, placing, and consolidation of concrete
Proper proportioning and adequate mixing of concrete
-Appropriate and controlled curing
-Proper procedure for de-tensioning and striping
-Proper handling, storing, ransporting, and erecting of members
-Complete and accurate production documentation


A plant producing architectural concrete products must have:
a. At least one Level III technician
b. At least one level I and one level II technician
c. at least one Level II technician

,d. at least one Level I technician - CORRECT ANSWER: D. At least a level 1 Technician


Each plant should have a written QA program. What is this program called and what are
the minimum items to be addressed by it. - CORRECT ANSWER: Minimum items to be
addressed by the QSM are:
-Management commitment
-Definition of organization structure
-Management review of the QA program
-Plant facilities layout and definition
-Purchasing procedures for QC compliance
-Uniform methods for reporting, reviewing, and maintaining records
-identification of training needs
-Control, calibration, and paintenance of necessary equipment
-Standards for shop drawings to ensure accuracy and uniform interpretation of
instructions for manufacturing handling
-Procedures for review and dissemination of project-specific requirements to production
and quality control personell.


Inspection and recordkeeping should cover many areas in production. List four of the
areas mentioned in this chapter. - CORRECT ANSWER: Inspection and record keeping
should cover the following areas:
-identification, examination, acceptance, and plant testing of materials and
subassemblies
-Inspecting and recording of tensioning
-Inspection of beds and forms prior to concreting
-Checking of dimensions of members, numbers, size, and positions of tendons,
reinforcing steel, other incorporated materials, openings, blockouts, and the like
-Regular inspection of batching mixing, conveying, placing, compacting, finishing, and
curing concrete
-Preparation of concrete specimens for strength testing and performance of concrete
tests

, -Inspecting operations of detensioning, product removal from beds, handling, and
storing
-Preparation of concrete specimens for strength testing and performance of concrete
tests
-Final inspection of finished product prior to shipment. Monitoring dimensions, camber,
blockouts, embedments, and finishes
-General observation of plant equipment, working conditions, weather, and other items
that have the potential for affecting the products
-Products purchased from suppliers shall comply with requirements for in-plant
prodcution as outlined in PCI's quality control manuals MNL-116 & 117
-To establish evidence of proper manufactureing and monitoring as outlined, a system
of records shall be utilized in each plant for the procedures outlined


Post-pour inspection covers many areas that need to be checked. Name three from this
chapter. - CORRECT ANSWER: Post-pour inspections should include
-Product identification
-Visual inspection of product
-Product dimensional verification
-Strand slippage
-Camber
-Product storage
-Product finish


Production personnel may be involved in quality control activities in practices where
they were directly involved - true or false? - CORRECT ANSWER: False


Project samples should be used for what project conditions? - CORRECT ANSWER:
Project samples should be used when required by the project specifications and when
special finishes are involved.


The flag shown on the weld symbol indicates what? - CORRECT ANSWER: Field Weld

Document information

Uploaded on
August 9, 2024
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$20.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Tutordiligent
3.6
(95)
Sold
614
Followers
220
Items
8461
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions