This is a summary of all the articles necessary for the first exam of the course Business Innovation through IT Project Management

Content preview

Paper Summary
Paper 1 – Framing of project critical success factors by a systems model
Introduction
- Critical success factors:
o Limited number of areas in which results will ensure successful competitive performance
for the organization
o Few key areas where ‘things must go right’ for the business to flourish
o Areas of activity that should receive constant and careful attention from management
o Areas in which good performance is necessary to ensure attainment of goals
Comparison of sets of factors
- Only limited agreement among authors on factors that influence project success
- Three most cited factors:
o Importance of project receiving support form senior management
o Having clear and realistic objectives
o Producing an efficient plan
Criticisms of the critical factor approach
- Two criticisms:
o Inter-relationship between factors are at least as important as individual factors
▪ CSF approach does not provide mechanism for taking account of inter-
relationships
▪ ‘better understanding of relationship is required if success factors are to be of any
guidance
o Factors approach tends to view implementation as static process instead of dynamic
phenomenon
▪ Ignores potential for a factor to have varying levels of importance at different
stages of the implementation process
The Formal System Model (FSM)
- Model of robust system that is capable of purposeful activity without failures
- Formal system comprises:
o Decision-making subsystem that manages the system
▪ Responsible for decisions about how the purpose if the system are to be achieved
o Performance monitoring subsystem that observes transformation processes and reports
deviations from expectations
▪ Used to conceptualize situation as a system → compares the resulting system
with the FSM to determine extent to which features necessary for purposeful
activity are present
- Model contains within it factors identified in literature as being critical to success
o Able to act as framing device for project critical success factors
o Should provide way of making links between factors → overcomes two main criticisms
of CSF
Conclusion
- Lot of overlap between sets but the factors selected for inclusion in individual lists vary to a
considerable extent
- FSM contains within it all of the factors covered by sets of CSFs
o Has advantage of being able to consider the relationship between factors

, o Overcomes third criticism of CSF approach
- FSM capable of distinguishing between successful and unsuccessful projects
o Can provide way of tackling human and organizational aspects of systems development
projects

, Paper 2 – One Size does not fill all projects: Exploring Classical
Contingency Domains
Introduction
- Everyone is using some formal project management structure → defined as a temporary
organization that has been established to complete a specific goal
Theoretical Background and Basic Proposition
- Classical contingency theory asserts that different external conditions might require different
organizational characteristics
o Effectiveness is contingent upon the amount of goodness of fit between structural and
environmental variables
- Mechanistic organization was described as formal, centralized, specialized and bureaucratic
o Predominate in simple, stable and more certain environments
o Organizations less differentiated, achieve high degree of integration
- Organic organization was characterized as being informal, decentralized, having just few
authority levels and using extensive levels of communication
o Cope better with uncertain and complex environments → provide more capacity
o Organizations highly differentiated and integrated
- Literature assumes that all projects share universal set of managerial characteristics
o ‘one-size-fits-all’ idea is disappointing
- Emergence of two dimensions – uncertainty & complexity
o Coping with uncertainty is central problem for complex organizations
o Technology and environments major sources of uncertainty
The Conceptual Model
- Focus on study of technical and engineering-based projects → result in new product, process or
service
- Four levels of uncertainty & three levels of complexity (Scope)

Document information

Study
Uploaded on
October 17, 2019
Number of pages
26
Written in
2018/2019
Type
Summary
$6.91

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
25
Followers
22
Items
18
Last sold
2 year ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions