MSSC MAINTENANCE TEST 1;
QUESTIONS AND CORRECT ANSWERS
What exactly is an accelerometer used for?
- Temperature measuring.
- Acoustic monitoring.
- Vibration measurements
- Oil Analysis - ANSWER Vibration measurement
Corrective work is done after preventive maintenance when
__________.
- The schedule calls for it.
- The supervisor requests it.
- The PM work was completed wrongly.
Problems are discovered.
Slips and falls are the most serious safety hazards when __________.
- Cleaning the fans.
- Mopping floors.
- Lifting big objects.
- Driving a tug - Answer: Mopping floors
Supply mistakes can occur when you rely on __________ without
monitoring their performance.
,- The customers
- Employees
- Suppliers
- Inspectors - ANSWER Suppliers
What is the best way to describe preventive maintenance?
- Periodical in nature.
- It was exhausting
- Breakdown repair
- Flexible - Periodic in nature.
A __________ is a board with tool outlines for placement that is useful
for ensuring that tools are returned to their right storage spot after usage.
- Story board
- Shadow Board
- Board of Tools
- Storage bin - ANSWER Shadowboard
The frequency of maintenance is usually listed on the _________.
- Preventive maintenance schedule.
- Work Order
- Warranty Card
,- Hold card - ANSWER Preventive maintenance plan
To do preventative maintenance on a machine, a maintenance specialist
should make sure that all usual tools and materials are ready.
- Increase the equipment downtime.
- Reduce equipment downtime.
- Ensure that the job is completed correctly.
- Ensure that machine parts are still available - ANSWER: Reduce
equipment downtime.
A __________ is known for placing tools and equipment where they
may be reached with minimal exertion.
- Poorly designed workstation.
- Well-designed workstation.
- Old-style workstation
- Pull system - A well-designed workstation.
What can be done once the corrective action form is completed?
- The form is saved somewhere safe and secure.
- The maintenance technician inspects the work order.
- The supervisor is summoned to determine if the job is completed.
, - Preventive maintenance should be documented after accomplished. -
ANSWER Preventive maintenance should be documented after
accomplished.
When an employee discovers a building maintenance issue that has a
detrimental influence on his or her work area, the first thing they should
do is __________.
- Report the matter to the supervisor.
- Try to solve the problem.
- Go home till the problem is resolved.
- Ignore the problem - ANSWER Report the incident to your supervisor.
What form of maintenance should be prioritized based on how frequently
it occurs?
- Predictive.
- Reactive.
- responsive
- Preventive - ANSWER
Reactive Maintenance is classified as a(n) _________ activity.
- Unplanned maintenance.
- planned maintenance
- Extremely responsive maintenance
QUESTIONS AND CORRECT ANSWERS
What exactly is an accelerometer used for?
- Temperature measuring.
- Acoustic monitoring.
- Vibration measurements
- Oil Analysis - ANSWER Vibration measurement
Corrective work is done after preventive maintenance when
__________.
- The schedule calls for it.
- The supervisor requests it.
- The PM work was completed wrongly.
Problems are discovered.
Slips and falls are the most serious safety hazards when __________.
- Cleaning the fans.
- Mopping floors.
- Lifting big objects.
- Driving a tug - Answer: Mopping floors
Supply mistakes can occur when you rely on __________ without
monitoring their performance.
,- The customers
- Employees
- Suppliers
- Inspectors - ANSWER Suppliers
What is the best way to describe preventive maintenance?
- Periodical in nature.
- It was exhausting
- Breakdown repair
- Flexible - Periodic in nature.
A __________ is a board with tool outlines for placement that is useful
for ensuring that tools are returned to their right storage spot after usage.
- Story board
- Shadow Board
- Board of Tools
- Storage bin - ANSWER Shadowboard
The frequency of maintenance is usually listed on the _________.
- Preventive maintenance schedule.
- Work Order
- Warranty Card
,- Hold card - ANSWER Preventive maintenance plan
To do preventative maintenance on a machine, a maintenance specialist
should make sure that all usual tools and materials are ready.
- Increase the equipment downtime.
- Reduce equipment downtime.
- Ensure that the job is completed correctly.
- Ensure that machine parts are still available - ANSWER: Reduce
equipment downtime.
A __________ is known for placing tools and equipment where they
may be reached with minimal exertion.
- Poorly designed workstation.
- Well-designed workstation.
- Old-style workstation
- Pull system - A well-designed workstation.
What can be done once the corrective action form is completed?
- The form is saved somewhere safe and secure.
- The maintenance technician inspects the work order.
- The supervisor is summoned to determine if the job is completed.
, - Preventive maintenance should be documented after accomplished. -
ANSWER Preventive maintenance should be documented after
accomplished.
When an employee discovers a building maintenance issue that has a
detrimental influence on his or her work area, the first thing they should
do is __________.
- Report the matter to the supervisor.
- Try to solve the problem.
- Go home till the problem is resolved.
- Ignore the problem - ANSWER Report the incident to your supervisor.
What form of maintenance should be prioritized based on how frequently
it occurs?
- Predictive.
- Reactive.
- responsive
- Preventive - ANSWER
Reactive Maintenance is classified as a(n) _________ activity.
- Unplanned maintenance.
- planned maintenance
- Extremely responsive maintenance