Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

CQM 6.4 Questions with Correct Answers 100% PassCQM 6.4 Question

Document preview thumbnail
Preview 1 out of 2 pages

Importance of Testing -ANSWER - If tests are not performed properly, there are many construction procedures and materials that cannot be confirmed as adequate. Visual observation alone is insufficient. Types of Tests -ANSWER - The contractor performs quality control (QC) testing to determine whether construction procedures and materials are producing the desired contractual product. Procedures -ANSWER - The contractor must outline proposed "testing procedures" as defined in Section 01 45 00.00 10 and/or Section 01 45 00.00 20 in the QC Plan. These proposed procedures must be discussed at the Coordination Meeting or the Mutual Understanding Meeting. The contractor must provide a list of required control tests and specify whether the tests are to be performed by an independent, approved testing laboratory, or using their own personnel and facilities. Regardless of which method of testing the contractor uses, they are required to assure that specified laboratory procedures are used and that laboratory facilities are certified. QA tests -ANSWER - are unannounced sporadic tests that repeat QC tests. QA testing can be performed by: • Government personnel using the contractor's equipment and facilities, • An independent testing laboratory, or • A field office, district, or division government laboratory. Before testing begins, the following questions should be answered and verified against the approved QC Plan -ANSWER - • Has all required testing been identified? • Are test reporting requirements understood? • Have laboratory facilities and testing equipment been verified as acceptable? • Are laboratory personnel qualified? • Has the calibration of equipment been verified as accurate? • Is there a procedure for documenting corrective steps? After QC testing has begun, a thorough examination must be made of the test reports submitted to ascertain that: -ANSWER - • Reports are being submitted for all tests performed, • Reports are complete and accurate, and • Failing tests must be retested and cross r

Content preview

CQM 6.4 Questions with Correct Answers 100% Pass
Importance of Testing -ANSWER - If tests are not performed properly, there are many construction procedures and materials that cannot be confirmed as adequate. Visual observation alone is insufficient.
Types of Tests -ANSWER - The contractor performs quality control (QC) testing to determine whether construction procedures and materials are producing the desired contractual product.
Procedures -ANSWER - The contractor must outline proposed "testing procedures" as defined in Section 01 45 00.00 10 and/or Section 01 45 00.00 20 in the QC Plan. These proposed procedures must be discussed at the Coordination Meeting or the Mutual Understanding Meeting.
The contractor must provide a list of required control tests and specify whether the tests are to be performed by an independent, approved testing laboratory, or using their own personnel and facilities.
Regardless of which method of testing the contractor uses, they are required to assure that specified laboratory procedures are used and that laboratory facilities are certified.
QA tests -ANSWER - are unannounced sporadic tests that repeat QC tests. QA testing can be performed by: • Government personnel using the contractor's equipment and facilities, • An independent testing laboratory, or • A field office, district, or division government laboratory.
Before testing begins, the following questions should be answered and verified against the approved QC Plan -ANSWER - • Has all required testing been identified? • Are test reporting requirements understood? • Have laboratory facilities and testing equipment been verified as acceptable? • Are laboratory personnel qualified? • Has the calibration of equipment been verified as accurate? • Is there a procedure for documenting corrective steps?
After QC testing has begun, a thorough examination must be made of the test reports submitted to ascertain that: -ANSWER - • Reports are being submitted for all tests performed, • Reports are complete and accurate, and • Failing tests must be retested and cross referenced to the original failing test.

Document information

Uploaded on
August 1, 2024
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
9
Followers
2
Items
446
Last sold
6 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions