A project team member has excluded a section of land in order to meet the
requirements of one of the LEED credits. Which statement is true about this action?

A. Certain sections of land can be excluded from the site boundary if a responsible
party submits a licensed professional exemption form.

B. This action is not allowed.

C. This action is only allowed if a project narrative is written to explain the exclusion.

D. This action is allowed if the gross floor area of the LEED project building is less
than 2% of the gross land area within the LEED project boundary. - CORRECT
ANSWER-B. This action is not allowed.

This is correct.

Land cannot be excluded for the purposes of complying with a credit/prerequisite.
This is known as gerrymandering.




The coordination of energy and water systems for the Integrative Process credit
should be addressed before which phase?

A. Conceptual design

B. Design development

C. Schematic design

D. Evaluation - CORRECT ANSWER-C. Schematic design




For Integrative Process credit which factors must project teams assess through
simple box energy modeling before completion of schematic design?

A. At least one load reduction strategy and one energy efficiency strategy

B. At least one source of renewable energy

C. At least one way to increase efficiency

,D. At least two potential load reduction strategies - CORRECT ANSWER-D. At least
two potential load reduction strategies




There are seven aspects to consider for energy analysis:

Site conditions

Massing and orientation

Building envelope attributes

Lighting levels

Thermal comfort ranges

Plug and process load needs

Programmatic and operational parameters




Project teams must assess at least two potential strategies for each aspect (so at
least a total of 14 things are being checked)




Which water-budget information provides enough data for use in the Discovery
phase of water-related systems?

A. A week's worth of data showing that 5,000 gallons (18,900 lite

rs) of water will be used

B. Data revealing that the building's indoor fixtures will use 10,000 gallons of water
(37,854 liters)

C. Data indicating that makeup water will be negligible

D. Data concluding that a rainwater collection system will supply 20,000 gallons
(75,708 liters) of water per year - CORRECT ANSWER-A. A week's worth of data
showing that 5,000 gallons (18,900 liters) of water will be used

, Water budgets are associated with a specific period of time (week, month, or year)
and a quantity of water (gallons or liters), both of which are included in this choice.

Water budgets need to include indoor, outdoor, process, makeup water, and on-site
supply water offsets.




A university housing project with 100 one-bedroom apartments has a baseline
parking capacity of 1 parking space/unit from the ITE handbook. The project will earn
1 point under LT Credit Surrounding Density and Diverse Uses but not earn LT Credit
Access to Quality Transit. The project includes off-street parking. How many
preferred parking spaces for carpools must the project include for LT Credit Reduced
Parking Footprint? - CORRECT ANSWER-3 spaces




A 40% reduction is required for projects that DO earn points under either LT Credit
Surrounding Density and Diverse Uses or LT Credit Access to Quality Transit.This
project has earned one of the credits, so a 40% reduction is required.

If any off-street parking spaces are provided, the project must include preferred
parking for carpools for 5% of the total parking capacity. The preferred parking is
calculated AFTER the reductions have been made. 100 spaces baseline from the
ITE handbook X 60% (40% reduction) = 60 total spaces60 spaces X 5% preferred
parking = 3 spaces




A commercial office project is adjacent to an existing movie theater. Which action is
an examples of transportation demand strategies that a project team could
implement to reduce parking demand?

A. Designate employee parking

B. Share the parking lot with the movie theater

C. Install preferred parking for carpools

D. All of the Above - CORRECT ANSWER-B. Share the parking lot with the movie
theater

Document information

Uploaded on
July 18, 2024
Number of pages
18
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
scholartutor
4.8
(923)
Sold
2789
Followers
3
Items
10777
Last sold
4 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions