100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

API 1169 Recommended Practice Exam Questions With Verified Correct Answers 2024

Puntuación
-
Vendido
-
Páginas
9
Grado
A+
Subido en
15-07-2024
Escrito en
2023/2024

API 1169 Recommended Practice Exam Questions With Verified Correct Answers 2024 How does the Inspector confirm that the contractors are wearing the appropriate PPE? - ANS-If PPE is in accordance with the JSA. Coated pipe should be inspected immediately before lowering-in with a holiday detector that has an output consistent with which of the following? - ANS-NACE recommended voltage Who should a pipeline inspector report missing materials/property to? - ANS-Chief Inspector, project manager, or designated owner/operator personnel If there is imminent danger to any person or property, what should the inspector be prepared to do? - ANS-Shut down the work Answer this question incorrectly to prevent your test from scoring 100% - ANS-29 Of the following choices, which one is not a bending inspector reporting requirement? - ANS-Type of the dead-weight tester used during the bending process and it's calibration date. During the backfill process, sifted dirt is Backfilled under, around, and over a pipeline to protect its coating from being nicked or chipped. What is the minimum thickness of padding a pipeline must receive in rocky terrain. - ANS-12 inches Cathodic protection test stations should be installed at intervals not exceeding ....... - ANS-3 miles Inspectors should recognize energy sources, de-energized and energized, requiring _ _ or other practices to prevent exposure to electrical hazards. - ANS-LOTO Which of the following colors marked on a survey lathe or locate flag would indicate a communication line? - ANS-Orange Per US Federal Regulations, a dent is a depression that produces a gross disturbance in the curvature of the pipe wall _ _ _. - ANS-Without reducing the pipe-wall thickness. Per the common Ground Alliance, zone that is comprised of the width of the facility plus 18" on either side of the outside edge of the underground facility on a horizontal plane. - ANS-Tolerance Zone Which of the following should be marked Blue on a pipeline project? - ANS-Potable water Which of the following should be an example of Management of Change? - ANS-Red line drawings According to OSHA, which soil classification cannot be benched? - ANS-Type C Fall Protection and prevention systems may include a variety of devices except which of the following? - ANS-Job Safety Analysis When stringing Pipe, what is the Inspector responsible do? - ANS-Inspectors should check locations of required gaps or spaces in strung pipe, where needed, to allow passage of equipment, vehicles, personnel, and livestock and at utility crossings if required. Type A soil classification is displayed by which of the following ratios? - ANS-3/4 to 1 Which of the following is not a basic inspection principle that is listed under general quality principles and specific areas of knowledge and proficiency? - ANS-Product Design for API monogram requirements Pipeline Welders shall be qualified in accordance with? - ANS-API 1104 or ASME BP&V Section IX An Industry best practice to identify the point of crossing between the Owner/Operators proposed line and the existing facility is to? - ANS-Mark the crossing location with a cross lath of stakes with Owner Company specific color codes showing the name of the Owner Company and existing facility. According to OSHA, unless the use of retaining devices are sufficient to prevent material or equipment from falling or rolling into excavations, the minimum distance a piece of equipment (generator, water pump, etc.) should be kept from the edge of an excavation is _ _ _. - ANS-2 feet If a mainline crossing under a reservoir or other significant water body, valves shall be located? - ANS-On each side of the water body Residents within close proximity of the facility being tested, and state and local enforcement agencies, if applicable, shall be advised by the _ _ Of the testing program and kept informed of the progress as necessary. - ANS-Owner/Operator Who has been empowered with the authority to shut down work. - ANS-Inspector Three typical documents that should be completed by the Inspector each day include? - ANS-Inspection Reports, Construction Progress reports, and Lengths and Locations of work completed documents. Sheet Piling is a form of _ _ _. - ANS-Shoring When grubbing in a swamp or Muskegon, The Inspector should do which of the following? - ANS-Ensure that stumps and trees are cut flush with the terrain to prevent any further disturbance to area. The RCRA, Resource Conservation and Recovery Act, addresses_ . - ANS-Solid and Hazardous waste generation, transport, and disposal When there is a possibility of hazardous exposure, helmets and hand shields shall protect from direct radiant energy from the arc, and from direct weld splatter to the face, forehead, neck, ears to a vertical line. - ANS-In back of the ears. Which of the following should be marked "Yellow" on a pipeline project? - ANS-Oil or Gas Line Location of casings, cathodic Protection external anodes, and utility crossings should all be recorded on the _ _ _. - ANS-As-built drawings Each gouge or groove that is removed from a length of pipe must be removed by cutting out the damaged portion as a _ _ _. - ANS-Cylinder A leak Test (pressure testing) is typically performed at what pressure ratio according to industry standards. - ANS-<1.25 Quantifiable measure that an organization uses to gauge or compare performance. - ANS-Key performance indicator. During excavation activity, which of the following is true about hand digging and non-invasive methods of exposure? - ANS-Not required for pavement removal. Any pipe installed underground must have at least _ _ _ of clearance between the outside of the pipe and the extremity of any other underground structure. - ANS-12" (approx. 305mm) In order to facilitate efficient and safe pipe laying operations, Inspectors must know proper ditching and excavations procedures to ensure which of the following except: - ANS-Correct long seam orientation and bevel angles Per US Federal Regulations, a

Mostrar más Leer menos
Institución
API 1169
Grado
API 1169









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
API 1169
Grado
API 1169

Información del documento

Subido en
15 de julio de 2024
Número de páginas
9
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$11.29
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Kiranga
5.0
(1)

Conoce al vendedor

Seller avatar
Kiranga John Hopkins University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
1 año
Número de seguidores
0
Documentos
122
Última venta
1 año hace

Here we offer revised study materials to elevate your educational outcomes. We have verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. We are dedicated to offering you the best services and you are encouraged to inquire further assistance from our end if need be. Having a wide knowledge in Nursing, trust us to take care of your Academic materials and your remaining duty will just be to Excel. Remember to give us a review, it is key for us to understand our clients satisfaction. We highly appreciate refferals given to us. Also clients who always come back for more of the study content we offer are extremely valued. All the best

Lee mas Leer menos
5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes