Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

AC Exam - Construction Geomatics with 100- correct answers

Document preview thumbnail
Preview 2 out of 10 pages

Which of the following pieces of equipment does not measure vertical angles? A. builder's level B. theodolite C. transit D. robotic total station A. builder's level What type of telescoping rod is often used with levels, transits, and total stations? A. Alachua rod B. Leon rod C. Pinellas rod D. Philadelphia rod D. Philadelphia rod How many feet are in 1 mile? A. 12 B. 100 C. 5,280 D. 12,000 C. 5,280 If a 1,000-ft road has a vertical rise of 10 ft what percent incline does the road have? A. 0.01% B. 0.10% C. 1% D. 10% C. 1% The contour lines showing the existing grade on a topographic survey are commonly______________________. A. bold solid lines B. highlighted solid lines C. colored dashed lines D. lightly colored dashed lines D. lightly colored dashed lines What do contour lines that are spaced closely together indicate? A. slight slope B. steep slope C. direction of erosion D. direction of water runoff B. steep slope A rectangular slab on grade is 60 ft 0 in. long × 45 ft 0 in. wide. What is the diagonal measurement in feet and inches? A. 52 ft 6 in. B. 75 ft 0 in. C. 105 ft 8 in. D. 115 ft 11 in B. 75 ft 0 in. 60^2 + 45^2 = diagonal ^.5 = 75 ft Assume you have a right triangle with a hypotenuse of 310 ft. If one of the angles is 20º, what is the length of the side that is opposite this angle? A. 106.03 B. 112.84 C. 291.09 D. 851.73 A. 106.03 A rod reading of 4.72 ft is taken on a benchmark whose elevation is 813.30. The finish floor is 809.00. The top of the batter board is set 1 ft above the finish floor. What rod reading is required to set the line for the top of the batter board? A. 4.30 B. 5.30 C. 8.02 D. 9.02 C. 8.02 (813.3 + 4.72) - 810 = 8.02 What does the surveying abbreviation TP mean? A. tangent point B. turning point C. traverse point D. terminal point B. turning point Using Figure 9-13, what is the benchmark elevation at IP #4? Starting pg 131/137 A. 864.62 B. 889.90 C. 896.27 D. 902.64 B. 889.90 You are required to establish grade to the bottom of a footing that is 1ft thick. The elevation at the top of the footing is 102.33 ft. The backsight of the instrument on the benchmark of 100.00 ft is 6.78. What is the correct reading of the rod at the bottom of the footing? A. 0.64 B. 3.81 C. 4.45 D. 5.45 D. 5.45 . (100 + 6.78) - (102.33 - 1) = 5.45 The job site has a primary vertical control point with a reference benchmark of 100 ft. An instrument is set up with an HI of 5.42 ft above the BM. A grade stake is set at an elevation of 96 ft. What is the height reading on the rod at the grade stake? A. 1.42 ft B. 4.00 ft C. 5.42 ft D. 9.42 ft D. 9.42 ft • 5.42 + 4.00 = 9.42 ft or • 105.42 - 96.00 = 9.42 ft Using the information provided in Figure 11, what is the benchmark elevation at IP #4? A. 864.62 B. 889.90 C. 896.27 D. 902.64 B. 889.90 • 877.26 + 19.01(total BS) - 6.37 (total FS) = 889.90 A superintendent wants to check if a 25' high block wall is within tolerances. Which of the following tools and their use would be the most appropriate? A. Use a plumb bob to measure the vertical plane B. Use a building level to determine its length C. Use a total station to quantify the number of blocks D. Use a pinellas rod to measure against a horizontal plane A. Use a plumb bob to measure the vertical plane What issue would a surveyor most likely need to account for when using a steel 300' measuring tape? A. Tape stretching when pulling lengths B. Calibrating the length markers on tape C. Inconsistencies in markers between foot intervals D. Expansion of the tape in warm weather D. Expansion of the tape in warm weather Which of the following situations would be most advantageous for using an inverted philadelphia rod? A. Verifying a highway grid layout B. Verifying the elevation of ceiling mounted ductwork C. Verifying a building footing layout D. Verifying the elevation of a piece of equipment B. Verifying the elevation of ceiling mounted ductwork


Document information

Uploaded on
July 13, 2024
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GUARANTEEDSUCCESS
4.3
(253)
Sold
689
Followers
314
Items
24876
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.