SWPPP study guide
Clean Water Act - ANS-Law set into place in 1970 for storm water regulation
NPDES - ANS-Regulations for monitoring storm water activity on a construction site, are
outlined in
Immediately after project is awarded and before you begin any site work - ANS-When
should you read and understand SWPP
Contaminated ground water - ANS-What is not an allowable storm water discharge or
non-storm water discharge
When jurisdiction of operations specifies you can start - ANS-When may construction
activity begin
303D list - ANS-Waters that fail anti-degradation list are placed on which list.
An officer and project owner - ANS-SWPPPs certification are signed by who
FALSE - ANS-The document that must be completed signed and submitted to the state
to obtain authorization to discharge is the NOT. (T/F)
All construction has been completed both inside and outside - ANS-NOT can be filed
when
is in charge of daily activities - ANS-Operations on a construction site are the entity in
charge of plans and specification and the entity who?
Stay out of trouble with the law - ANS-Motives for staying in compliance with storm
water objectives?
To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical
and biological integrity - ANS-Objectives of the clean water act are
National Pollutant Discharge Elimination System - ANS-NPDES stands for
, Site description and maps, inspection and maintenance procedure. Potential pollutant
sources, schedules of activities, site contact information, plan certification documents,
site contact info and descriptions of controls BMP - ANS-Which are a component of a
good SWPPP
False - ANS-Construction sediment is not considered a potential pollutant source (T/F)
Project owner, SWPPP designer - ANS-When modifying or substituting a storm water
BMP the contractor must consult with
False - ANS-NOI must be submitted to the appropriate agency before the storm water
pollution preventive plan is developed (T/F)
False, 303d List - ANS-Name of the list with impaired waters is called totally daily
maximum load (T/F)
It is required by law, it documents storm water management activity on your site, and it
demonstrates your intent to manage storm water on your site - ANS-You should have a
SWPPP for your construction site because?
Site specific - ANS-A well constructed SWPPP for your site should be?
Prior to commencing construction - ANS-The NOI must be submitted when?
Schedule of activities - ANS-One necessary component of a good SWPPP is?
Weather and Climate - ANS-Factors that may impact SWPPP scheduling activities
include
masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
ANS-Pollutant sources on a construction may include
Seek written approval of the project SWPPP designer or project owner - ANS-If you
believe BMP modification are necessary to the site you must?
Endangered species and historical preservation - ANS-The following consideration may
be incorporated into the SWPPP?
Site maps, erosion sediment control, BMPs, site specific sequences of construction
activities - ANS-The SWPPP will contain the following?
Clean Water Act - ANS-Law set into place in 1970 for storm water regulation
NPDES - ANS-Regulations for monitoring storm water activity on a construction site, are
outlined in
Immediately after project is awarded and before you begin any site work - ANS-When
should you read and understand SWPP
Contaminated ground water - ANS-What is not an allowable storm water discharge or
non-storm water discharge
When jurisdiction of operations specifies you can start - ANS-When may construction
activity begin
303D list - ANS-Waters that fail anti-degradation list are placed on which list.
An officer and project owner - ANS-SWPPPs certification are signed by who
FALSE - ANS-The document that must be completed signed and submitted to the state
to obtain authorization to discharge is the NOT. (T/F)
All construction has been completed both inside and outside - ANS-NOT can be filed
when
is in charge of daily activities - ANS-Operations on a construction site are the entity in
charge of plans and specification and the entity who?
Stay out of trouble with the law - ANS-Motives for staying in compliance with storm
water objectives?
To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical
and biological integrity - ANS-Objectives of the clean water act are
National Pollutant Discharge Elimination System - ANS-NPDES stands for
, Site description and maps, inspection and maintenance procedure. Potential pollutant
sources, schedules of activities, site contact information, plan certification documents,
site contact info and descriptions of controls BMP - ANS-Which are a component of a
good SWPPP
False - ANS-Construction sediment is not considered a potential pollutant source (T/F)
Project owner, SWPPP designer - ANS-When modifying or substituting a storm water
BMP the contractor must consult with
False - ANS-NOI must be submitted to the appropriate agency before the storm water
pollution preventive plan is developed (T/F)
False, 303d List - ANS-Name of the list with impaired waters is called totally daily
maximum load (T/F)
It is required by law, it documents storm water management activity on your site, and it
demonstrates your intent to manage storm water on your site - ANS-You should have a
SWPPP for your construction site because?
Site specific - ANS-A well constructed SWPPP for your site should be?
Prior to commencing construction - ANS-The NOI must be submitted when?
Schedule of activities - ANS-One necessary component of a good SWPPP is?
Weather and Climate - ANS-Factors that may impact SWPPP scheduling activities
include
masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
ANS-Pollutant sources on a construction may include
Seek written approval of the project SWPPP designer or project owner - ANS-If you
believe BMP modification are necessary to the site you must?
Endangered species and historical preservation - ANS-The following consideration may
be incorporated into the SWPPP?
Site maps, erosion sediment control, BMPs, site specific sequences of construction
activities - ANS-The SWPPP will contain the following?