• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

ACI Certification (1)

Document preview thumbnail
Preview 1 out of 4 pages

ACI Certification (1)

Content preview

ACI Certification
15 mm (3 in) - ANS-The end temperature sensing portion of the temperature measuring device
is submerged a minimum of _______ into the freshly mixed concrete.

0.5 deg C (1 deg F) throughout a range of 0-50 deg C (30-120 deg F) - ANS-The temperature
measuring device shall be capable of accurately measuring the temperature of freshly mixed
concrete to _________ throughout a range of __________.

True - ANS-T/F The temp. of concrete may be measured in a wheelbarrow.

True - ANS-T/F The temp of conc. may be measured in a wall form.

False - ANS-T/F A composite sample of concrete is required even if the only purpose for
obtaining the sample is to determine temp.

Dampened - ANS-What must be done to the sample container prior to sampling concrete?

Pressed around the surface of the device gently - ANS-What must be done to the concrete
surrounding the temperature measuring device after the device is submerged in the fresh
concrete?

2 min but no more than 5 min - ANS-How long must the temperature measuring device remain
in the freshly mixed concrete?

Report the temp. - ANS-After the temp. of the concrete is read, what then is required?

0.5 deg C (1 deg F) - ANS-The temp. of the concrete is reported to the nearest.

Strength verification - ANS-According to test method C1064/C1064M, what is one reason to
take the temp. of concrete?

False - ANS-A max temp. of freshly mixed conc. is specified in Test method C1064.

False - ANS-The sample of concrete used for temp. determination must be rodded 25 times?

compliance - ANS-sampling by this practice covers procedures for obtaining representative
samples, on which tests are to be performed to determine _______ with quality requirements of
the specifications under which the concrete is furnished.

Stationary mixer, paving mixer, revolving drum truck, continuous mixer, and open top -
ANS-What 5 types of equipment does the sampling section cover?

Document information

Study
Uploaded on
June 23, 2024
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ace360PRO
4.7
(108)
Sold
262
Followers
3
Items
10566
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions