The contract documents for a project should be written primarily to protect the interest of
the CM. - ANS-False

The owner, CM and Designer are less likely to be involved in disputes with the
Contractor if a contract is awarded to the lowest bidder. - ANS-False

Use of standard forms of agreement will always result in fewer disputes? - ANS-False

After the owner accepts a cm's proposed GMP as contemplated by the CMAA CM at
Risk Series documents, the responsibilities and duties of the CM are essentially the
same as if the Owner and CM were using the AIA GMP documents. - ANS-False

In the CMAA CM at Risk series documents, the CM may perform part of the work if the
CM so chooses? - ANS-False

Contractors generally believe the Designer acts independently and in the joint interests
of the Owner and Contractor when making decisions regarding contract claims and
change orders. - ANS-False

The CMAA standard forms of agreements(Agency- or CM at risk series) are the best
documents for an Owner to use on all design and construction projects. - ANS-False

The CMAA contract documents were written primarily to protect the interest of the CM. -
ANS-False

In the CMAA Agency series the Designer is entitled to object to provisions of
Construction Management Plan as prepared by the CM. - ANS-True

When providing services specified in CMAA document A-1, the CM may have a fiscal
liability for negligent preparation of the cost estimates. - ANS-True

In the CMAA CM at Risk Series documents, the CM is the Owner's principle agent until
a GMP is accepted by the Owner. - ANS-True

If an Owner uses the CMAA documents A-4, the Owner may be obligated to
compensate the Designer as an additional service for site visits requested by the CM. -
ANS-True

, If a Designer uses the CMAA A-4 contract document instead of the AIA B-141/CM
document, the Designer's exposure to professional liability during the construction
phase is reduced. - ANS-True

The CM has the autority on behalf of the owner to disapprove or reject work and to
revoke, alter, enlarge or relax and requirements of the contract documents. - ANS-False

The Owner has the obligation to exercise its right to stop work when it would be to the
benefit of the Contractor and the Contractor requests the Owner to exercise that right. -
ANS-False

All communications to the Designer and Owner from the Contractor must be submitted
through the CM - ANS-True

The Owner shall pay all charges to utility owners for any of the connections to the work.
- ANS-False

The Contractor has no obligation to provide others contractors working on the site safe
access to the site. - ANS-False

The Contractor's duty and responsibility for safety and protection of the work extends to
the issue of Notice of Substantial Completion. - ANS-False

If the Contractor causes damage to the work property of another contractor working on
the site, the Contractor shall seek to remedy the situation through the CM. - ANS-False

If it become apparent that the Contractor's schedule will not be met and it is due to the
fault of the Contractor, the Contractor agrees that it will increase the number of
employees and such crafts to regain the lost schedule progress, increase the number of
work hours per shifts, or shifts per a work day, or work days per week to regain the lost
schedule progress. - ANS-True

Unit priced items do not include overhead and profit in the unit price. - ANS-False

When the delay is due to cause beyond the control of the Owner and the Contractor, an
extension of contract time in the amount equal to the item lost on the critical path shall
be the Contractors' sole and exclusive remedy for such delay. - ANS-True

Dokument Information

Studium
Hochgeladen auf
22. juni 2024
Anzahl der Seiten
8
geschrieben in
2023/2024
Typ
Prüfung
Enthält
Fragen & antworten
$8.49

Falsches Dokument? Kostenlos tauschen Innerhalb von 14 Tagen nach dem Kauf und vor dem Herunterladen kannst du ein anderes Dokument wählen. Du kannst den Betrag einfach neu ausgeben.
Geschrieben von Student*innen, die bestanden haben
Sofort verfügbar nach Zahlung
Online lesen oder als PDF

Seller avatar
Bewertungen des Ansehens basieren auf der Anzahl der Dokumente, die ein Verkäufer gegen eine Gebühr verkauft hat, und den Bewertungen, die er für diese Dokumente erhalten hat. Es gibt drei Stufen: Bronze, Silber und Gold. Je besser das Ansehen eines Verkäufers ist, desto mehr kannst du dich auf die Qualität der Arbeiten verlassen.
scholartutor
4.8
(923)
Verkauft
2789
Anhänger
3
Sachen
10777
Zuletzt verkauft
3 Jahren vor



Warum sich Studierende für Stuvia entscheiden

on Mitstudent*innen erstellt, durch Bewertungen verifiziert

Geschrieben von Student*innen, die bestanden haben und bewertet von anderen, die diese Studiendokumente verwendet haben.

Nicht zufrieden? Wähle ein anderes Dokument

Kein Problem! Du kannst direkt ein anderes Dokument wählen, das besser zu dem passt, was du suchst.

Bezahle wie du möchtest, fange sofort an zu lernen

Kein Abonnement, keine Verpflichtungen. Bezahle wie gewohnt per Kreditkarte oder Sofort und lade dein PDF-Dokument sofort herunter.

Student with book image

“Gekauft, heruntergeladen und bestanden. So einfach kann es sein.”

Alisha Student

Arbeitest du an deiner Quellenangabe?

Erstelle korrekte Quellenangaben in APA, MLA und Harvard mit unserem kostenlosen Zitiergenerator.

Arbeitest du an deiner Quellenangabe?

Häufig gestellte Fragen