• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 1 pages
Exam (elaborations)

ACI Certification_ Performance Checklist (1).

Document preview thumbnail
Preview 1 out of 1 pages

ACI Certification_ Performance Checklist (1).

Content preview

ACI Certification: Performance Checklist
All water and admixtures must be added to the mixer. - ANS-What must occur before a sample
of concrete can be taken from a revolving drum mixer?

In two or more portions of concrete, at regularly spaced intervals, and from the middle of the
batch. - ANS-When sampling from a stationary or revolving drum mixer, what is collected and
when is it taken during discharge?

Repeatedly pass a receptacle through the entire discharge stream. Completely divert the
discharge stream into a sample container. - ANS-How are the sample portions obtained from
the discharge stream of a stationary or revolving drum mixer?

Discharge the contents of the paving mixer. Obtain samples from at least five different portions
of the pile. - ANS-Describe the procedure for collecting a sample from a paving mixer.

28 L (1 cubic foot) - ANS-What is the minimum size for a sample when strength test specimens
are to be molded?

15 minutes - ANS-What is the maximum allowable time between obtaining the first and final
portions of the composite sample?

Combine and remix the samples with a shovel. - ANS-What action is required after the individual
concrete samples have been transported to the place where tests are to be performed?

Wet sieving - ANS-What should be done if the concrete contains aggregate larger than is
appropriate for the size of the molds or the equipment being used?

5 minutes - ANS-Start the tests for slump, temperature, and air content within how many
minutes after obtaining the final portion of the composite sample?

15 minutes - ANS-Start molding specimens for strength tests within how many minutes after
fabricating the final portion of the composite sample?

Sun, wind, and rapid evaporation. Contamination. - ANS-From what must the concrete sample
be protected?

Document information

Study
Uploaded on
June 22, 2024
Number of pages
1
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ace360PRO
4.7
(108)
Sold
262
Followers
3
Items
10566
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions