• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

Concrete Batch Plant Operator Exam (FDOT) || with A+ Guaranteed Solutions.

Document preview thumbnail
Preview 1 out of 4 pages

Stockpiles of aggregate shall be maintained in a well-drained condition in order to: correct answers Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? correct answers 24 Free moisture of the aggregate means: correct answers Moister on the surface of an aggregate that is above and beyond the absorbed moister in the aggregate. If the moister test is done other than by the cook-out method, how often shall the other methods be verified? correct answers Each week For drill shaft concrete, the quantity of cement replaced with fly ash shall be: correct answers 33 thru 37% In concrete, which material has a specific gravity of one? correct answers Water What is the air content range for all classes of structural concrete except Class IV Shaft? correct answers 1.00 thru 6.00% When can unmetered water be added to the concrete? correct answers Not at all. Do not allow the total number of revolution at mixing speed to exceed: correct answers 160 Revolutions After all materials have been charged into the transit mixer drum, the concrete must be mixed at how many revolutions at the plant before leaving for the project? correct answers 70 to 100 When the water meters / scales are calibrated, prior to production, at what frequency should they be checked there after? correct answers 3 moths To what accuracy should the scales for weighing cement , pozzolan, slag and aggregates at the plant be maintained correct answers 0.5% of maximum load normally handled For concrete containing a water-reducing retarding admixture, in an agitator truck, the maximum time for depositing the concrete shall not exceed: correct answers 90 minutes If a load of concrete has been rejected due to excessive slump, the concrete may remain in the transporting vehicle to reduce the slump. correct answers Is not allowed. Who places the orders for concrete with the producer? correct answers The contractor


Document information

Uploaded on
June 13, 2024
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.79

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
807
Followers
438
Items
40071
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.