• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

Nccco Core Exam Questions With All Answers

Document preview thumbnail
Preview 3 out of 21 pages

Nccco Core Exam Questions With All Answers If taking sides strain on a boom what concerns the operator the most - ANSWER- Boom damage If a crane load chart has capacities listed in the shaded area this means that - ANSWER- If overloaded structural confidence will be compromised As the layers of rope on a drum increase the allowable line Pull wil - ANSWERDecrease Of the following actions which one will most likely cause a side load condition - ANSWER- Abruptly starting or stopping the swing Cording to OSHA with any hook ball or attachment at its lowest point a minimum of blank reps must remain on the drum at all times - ANSWER- 2 What is the minimum distance of crane must maintain from powerlines rated below 50 KV - ANSWER- 10 feet What is the best procedures to follow if underground utilities are present - ANSWERContact utility company For boom is reeves eccentrically to the block the most common result would be - ANSWER- Twisting of the boom What is the safety factor for 6 x 19 IWRC wire rope - ANSWER- 3.5-1 What is the safety factor for rotation resistor wire rope - ANSWER- 5-1 What is the safety factor for rigging hardware - ANSWER- 5-1 What is the safety factor one hoisting personnel using IWRC wire Rope - ANSWER- 7-1 What is the safety factor hoisting personnel using rotation resistance wire rope - ANSWER- 10-1 Unless the manufacturer states otherwise the wind speed to seize hoisting Shall be - ANSWER- 30 mph When hoisting personnel OSHA requires wind speed not to exceed - ANSWER- 20 mph Who has the responsibility of determining the correct weight of the load - ANSWERSupervisor When an operator leave there a crane they must - ANSWER- Land load engage all locks and Pawls and lock machine When is it safe to work closer than alarm for distance from any powerline - ANSWERWhen the utility company certifies that the lines are D energized When operating a crawler crane what is the most unstable allowable quadrant of operation - ANSWER- Side What is not a good location for crane set up - ANSWER- Above utilities If an operator arrives at a job site and the crane is already set up how would he checked the main an auxiliary breaks - ANSWER- Left the load a few inches off the ground and test the brakes


Document information

Uploaded on
June 11, 2024
Number of pages
21
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$12.39

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
4
Followers
3
Items
668
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.