Asbestos Project Monitor Examination 2024 Questions Answered Correctly| Already Passed Rated +++
Asbestos Project Monitor Examination 2024 Questions Answered Correctly| Already Passed Rated +++ What is Surfactant? - Correct Answer A chemical that reduces the surface tension of water Class 1 Asbestos Project - Correct Answer Removal of TSI & Surfacing How do you find the Maximum Use of Concentration? MUC/MUL - Correct Answer PEL x PF = MUC What is the sequence for Phase 2 work area preparation? - Correct Answer 1. Set up signs 2.Build the worker Decon unit 3.Preparation of the regulated abatement work area 4. (NYS only) wait 4 hours What is the order of the Decon room from the work area out ? - Correct Answer Equipment room(dirty room) Airlock Shower Airlock Clean room What does NESHAP prohibits? - Correct Answer Prohibits visible emission and Prohibits any dry removal of ACM Who needs to be on site for a Class 1 or Class 2 Asbestos project ? - Correct Answer OSHA Competent Person Supervisor & Handlers What is the OSHA Respirator standard? - Correct Answer 29 CFR 1910 134 What kind of projects need to be notified to the EPA? - Correct Answer All friable projects where the removal or disturbance of asbestos will be greater than or equal to 260 Linear ft, 160 square Ft, 35 cubic feet. EPA will be notified 10 business days in advance
Written for
- Institution
- Asbestos Project Monitor
- Course
- Asbestos Project Monitor
Document information
- Uploaded on
- June 9, 2024
- Number of pages
- 12
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- what is surfactant
- class 1 asbestos project
-
how do you find the maximum use of concentration
-
what is the sequence for phase 2 work area prepara
-
what is the order of the decon room from the work
Also available in package deal