Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

CSU CON 101 EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED.

Document preview thumbnail
Preview 2 out of 8 pages

CSU CON 101 EXAM 2 REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED. What are the Drawings and Project Manual? - -Contract Documents What are vertical "cuts" through a building? - -Section Views What are: Bidding Documents, Agreement, General Conditions, Supplementary Conditions, Technical Specifications - -Project Manual What is arranged using the CSI MasterFormat? - -Technical Specifications (Know Standard Divisions). What is the section that provides fundamental definitions for the contract, the work, and the drawings and specifications? - -General Provisions Who determines which type of contract will be used on a project? - -Owner What is a written request from the owner to change the scope of the project? - -Change Order What contract balances risk between the owner and the contractor? - -GMP Who bears the burden of a cost over-run in a Lump Sum Contract? - -Contractor How does an owner generally pay for construction? - -Through a series of monthly payments (or draws) What are final drawings used for the construction. - -Working Drawings or Contract Documents. What are the steps in the design process? - -(1) Programming and Feasibility, (2) Schematic, (3) Design Development, and (4) Contract Documents What is the step in the design phase when the financial feasibility of the project is first evaluated? - -Programming and Feasibility What is the process in which the architect sends the documents to the building department to determine if the plans follow code? - -Plan Check Who is responsible for ensuring that the design meets all building codes? - -Design Team What is one of the most underutilized resources available to the design team? - - Construction field personnel who actually install the building systems Or users of the project/building What is the process of identifying the best solution relative to cost? - -Value Engineering What is the process of identifying problems or areas of concern that exist with a project so that information can be factored into the decision-making process during the preconstruction phase? - -Due Diligence Which team member is tasked with assisting the PM and Super with managing the details of the contract? - -Contract Administrator Which team member moves back and forth between the jobsite and the office? - - Project Manager What agreement is used to purchase labor and possibly materials? - -Subcontract What are materials, labor, equipment and subcontract costs? - -Direct Costs What is the agreement between a vendor and a customer for the provision of certain products that meet a particular specification for a specified price? - -Purchase Order What is a contractor that self-preforms very little work? - -


Document information

Uploaded on
June 7, 2024
Number of pages
8
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Terryl
3.3
(16)
Sold
132
Followers
39
Items
8399
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.