100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CON 101 FINAL EXAM REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED.

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
07-06-2024
Written in
2023/2024

CON 101 FINAL EXAM REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED. 1. Review plans and Specs 2. Develop list of questions for clarifications 3. Attend the rebid meeting 4. Visit the project site - Identify the four preperation steps taken to start the estimating process - -Identify the four preperation steps taken to start the estimating process 49 - -The 2004 CSI master format is broken down into how many divisions addendum - -A change or addition to the contract documents issued after the documents have been released but before the bids are due Agency CM - -What is a construction manager that offers advice to the owner but is not responsible for any of the actual construction? An educated guess of the cost of construction - -What is a construction estimate? Apparent low-bidder - -What is low bidder announced at bid opening? Architect. - -Who deals with the function, life safety issues, and aesthetics of the building? back charges - -an amount of money charged against a subcontract for work that the general contractor performed because the subcontractor failed to do so backward pass - -A scheduling technique used to calculate an activities late start and late finish Bid Solicitation or Advertisement for Bid - -What contains information regarding bidding documents for public projects? Bidding Docs, General Conditions, Supplemental Conditions, Techinical Specs - -Name the four primary sections of the project manual Bidding Documents, Genral Conditions, Supplemental Conditions and techinical specs - -The project manual consists of BIM Model - -A digital representation of the physical and functional characteristics of a building displayed as a 3D model, with the added capability to integrate a whole array of design and construction data related to cost, schedule, materials, assembly, maintance, energy, use and more Building Program or Program - -What is a written statement that identifies and describes an owner's needs and requirement for a facility? Building Trades - -What other "industry player" group is essential to the project Callback - -A request from an owner that a contractor return to the job site to correct or redo some item of work Central Repository Approach - -The concept that all project information can be loaded into one database to create a single building information model Change order - -Requests made by the owner to add features to or subtract features from the scope of the project resulting in changes to the contract Civil, Architectual, Structural, electrical, and mechanical - -There is a particular way in which the drawings are organized in a set of drawings. Identify the order of drawings in a typical set of plans claim - -An issue that occurs during construction and remains unresolved after the job is complete Clash Detection - -A process for effectively identifying unintended material or system interferences in a 3D project model CM at-risk (CM/GC), D-B, and IPD - -What delivery methods use BVS? Competitive Low Bidding. - -What is the dominant method used to determine contract award in construction? Computer Aided Design - -What does CAD stand for? Conceptual Estimate - -What type of estimate would we probably do if we were meeting with a client for the first time and they wanted to get a rough idea about their project cost? Concrete - -CSI Division 3 concrete washout station - -A temporary container installed on a construction site to collect all water runoff from the washing of trucks, tools, and equipment associated with concrete. The container may perfabricated and delivered or built on-site Construction Model - -A building information model, typically prepared by a contractor, that links construction-specific information such as work breakdown structures and cost data to project elements in the 3D model Contingencies - -An amount of money added to an estimate to cover unkown conditions or risk facotrs Contract Documents - -The drawings, con

Show more Read less
Institution
CON 101
Course
CON 101









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CON 101
Course
CON 101

Document information

Uploaded on
June 7, 2024
Number of pages
15
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Terryl Cornell College
View profile
Follow You need to be logged in order to follow users or courses
Sold
125
Member since
1 year
Number of followers
39
Documents
8393
Last sold
3 weeks ago

3.3

16 reviews

5
2
4
7
3
3
2
1
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions