CON 101 FINAL EXAM REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED.
CON 101 FINAL EXAM REVIEW QUESTIONS AND ANSWERS, GRADED A+/ VERIFIED. 1. Review plans and Specs 2. Develop list of questions for clarifications 3. Attend the rebid meeting 4. Visit the project site - Identify the four preperation steps taken to start the estimating process - -Identify the four preperation steps taken to start the estimating process 49 - -The 2004 CSI master format is broken down into how many divisions addendum - -A change or addition to the contract documents issued after the documents have been released but before the bids are due Agency CM - -What is a construction manager that offers advice to the owner but is not responsible for any of the actual construction? An educated guess of the cost of construction - -What is a construction estimate? Apparent low-bidder - -What is low bidder announced at bid opening? Architect. - -Who deals with the function, life safety issues, and aesthetics of the building? back charges - -an amount of money charged against a subcontract for work that the general contractor performed because the subcontractor failed to do so backward pass - -A scheduling technique used to calculate an activities late start and late finish Bid Solicitation or Advertisement for Bid - -What contains information regarding bidding documents for public projects? Bidding Docs, General Conditions, Supplemental Conditions, Techinical Specs - -Name the four primary sections of the project manual Bidding Documents, Genral Conditions, Supplemental Conditions and techinical specs - -The project manual consists of BIM Model - -A digital representation of the physical and functional characteristics of a building displayed as a 3D model, with the added capability to integrate a whole array of design and construction data related to cost, schedule, materials, assembly, maintance, energy, use and more Building Program or Program - -What is a written statement that identifies and describes an owner's needs and requirement for a facility? Building Trades - -What other "industry player" group is essential to the project Callback - -A request from an owner that a contractor return to the job site to correct or redo some item of work Central Repository Approach - -The concept that all project information can be loaded into one database to create a single building information model Change order - -Requests made by the owner to add features to or subtract features from the scope of the project resulting in changes to the contract Civil, Architectual, Structural, electrical, and mechanical - -There is a particular way in which the drawings are organized in a set of drawings. Identify the order of drawings in a typical set of plans claim - -An issue that occurs during construction and remains unresolved after the job is complete Clash Detection - -A process for effectively identifying unintended material or system interferences in a 3D project model CM at-risk (CM/GC), D-B, and IPD - -What delivery methods use BVS? Competitive Low Bidding. - -What is the dominant method used to determine contract award in construction? Computer Aided Design - -What does CAD stand for? Conceptual Estimate - -What type of estimate would we probably do if we were meeting with a client for the first time and they wanted to get a rough idea about their project cost? Concrete - -CSI Division 3 concrete washout station - -A temporary container installed on a construction site to collect all water runoff from the washing of trucks, tools, and equipment associated with concrete. The container may perfabricated and delivered or built on-site Construction Model - -A building information model, typically prepared by a contractor, that links construction-specific information such as work breakdown structures and cost data to project elements in the 3D model Contingencies - -An amount of money added to an estimate to cover unkown conditions or risk facotrs Contract Documents - -The drawings, con
Written for
- Institution
- CON 101
- Course
- CON 101
Document information
- Uploaded on
- June 7, 2024
- Number of pages
- 15
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
con 101 final exam review questions and answers g
Also available in package deal