US Army Explosive Safety Familiarization Exam with 100% Correct Answers
Your installation is refurbishing an existing PES facility built in 1968. Do you need to complete an ESSP? - Answer--Yes, and it requires DDESB approval. As distance from the potential explosion site decreases, the potential for damage to an exposed site from an explosion.... - Answer--increases. Your installation is increasing the NEW for a storage site built in 1969 and storing a hazard division that was not previously approved for that location. Do you need to complete an ESSP? - Answer--Yes, and it requires DDESB approval. Intraline distance (ILD) is the minimum distance permitted between... - Answer--two operating buildings. The purpose of an ESSP is to ensure safety, provide specifications, and... - Answer--establish limits. You must submit an ESSP for DDESB approval if the installation is... - Answer--building an ES within an existing ESQD arc. Failing to submit a successful ESSP may result in... - Answer--reduced operational capacity. Which are the phases of the ESSP process in order? - Answer--Development and Evaluation, Submission, DDESB Review, and Implementation.
Written for
- Institution
- US Army Explosive Safety Familiarization
- Course
- US Army Explosive Safety Familiarization
Document information
- Uploaded on
- June 4, 2024
- Number of pages
- 2
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
us army explosive safety familiarization exam with
Also available in package deal