Mass oil burner Exam Questions with Correct Answers
Mass oil burner Exam Questions with Correct Answers What must be done before removing an oil tank and where is it obtained? - Answer-permit, from the fire department All oil tanks over ________________ must have an open air vent pipe. Minimum pipe size of ___________. The fill pipe cannot exceed the size of vent pipe. Both must terminate _______________? - Answer-10 gallons, 1 1/4", outside of building No more than how many gallon oil tank (1) can be exposed in a building? - Answer-660 gallons Exposed tanks ( more than 1) in a building cannot be more than how many gallons? - Answer-1320 What must be done with any unused openings on an oil tank? - Answer-Made vapor tight What cannot be used for fill and vent piping? - Answer-Solder copper tubing and fittings, or plastic piping. All oil tanks with fill and vent pipes must have what type of gauging device? - Answer-Visual or audible The maximum total capacity of all the tanks located above the lowest level of a building cannot exceed how many gallons? - Answer-60 The maximum total capacity of all the tanks located above the lowest level of a building has an exception what is it? - Answer-A tank on slab adjacent to first floor Vent pipe mjst terminate at least how many feet above grade? - Answer-3 feet Vent pipe must terminate ____ feet vertically and _______ horizontally from any building opening. - Answer-Two, two
Document information
- Uploaded on
- June 2, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers