SPCB – Regulations Exam Questions and Answers 100% Pass
SPCB – Regulations Exam Questions and Answers 100% Pass 1911: Address, Change of Employment - Answer️️ -Each operator, field rep and applicator shall register their address with the board. They shall notify the board within 10 days of any change. The current address registered should be that of the registered company if employed or their home address if not employed 1937: Qualifications of Applicants - Answer️️ -Branch III requires: Minimum 100 hours of training, 80 of which has to be field work Must include training in Integrated Pest Management and structural pest control services effect on water quality 1937.14: Quality of Work Completed - Answer️️ -All work shall be done in specific requirements and shall meet accepted trade standards 1937.16: Notice to Owner - Answer️️ -A notice given to the owner that under California Mechanic Lien law a registered company can place a lien on your home for payment. The registered company must present owner with a "Preliminary Lien Notice" notifying the owner that the registered company has this right 1941: Failure to Appear for Examination - Answer️️ -Failure to appear for an examination will result in the loss of the examination fee unless rescheduled 5 days in advance to given a waiver by the board 1950: Continuing Education Requirements - Answer️️ -Only one branch of pest control license (Branch III) held: 16 total hours of continuing education during each 3 year renewal period Must include minimum of: 4 technical hours 2 Integrated Pest Management 8 Structural Pest Control Act or Rules and Reg 1970.4: Pesticide Disclosure Requirement - Answer️️ -For fumigations a form needs to be given out stating: The pest that is being controlled The pesticide used and the active ingredient The health cautionary statement For any pesticide use their must be written notification of the pesticide use left for the owner/rep of dwelling 1970.6: Fumigation of Connecting Structures - Answer️️ -If fumigation is necessary must inquire of the owner/rep if there are any conduits, drains, construction elements, etc that could allow the passage of the fumigant to an adjacent/adjourning structure. Primary contractor must perform inspection looking for construction elements that would allow the fumigant to pass If passage is possible to an adjourning/adjacent property, said property will b
Document information
- Uploaded on
- May 29, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers