Maryland Asbestos Exam | 100% Correct Answers | Verified | Latest 2024 Version
The lean ratio of an extension ladder - 4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? - 5 samples taken inside with results of each 0.0 f/cc What are the notification requirements in Virginia? - 20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individuals need an asbestos supervisor or working linsense - Need a license everywhere Type of bond that would ensure that the general contractor will compensate subcontractors for labor and materials - Performance Bond Minimum respiratory protection on a class 1 asbestos project with no NEA - Full face air purifying respirator What is the maximum content permitted in the work area where an air purifying respirator is being worn? - 23.5% Chest XRays must be evaluated by what class reader? - Class B What is the APF for a full face air purifying respirator - 50 Friable ACM is any material that can be: - Crushed, pulverized, reduced to powder by hand pressure when dry The OSHA permissible exposure limit is - 0.1 f/cc over 8 hours TWAAccording to ASHERA, how many air samples must b
Document information
- Uploaded on
- May 24, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers