API 1169 Study Test Questions Test RM#1 | Questions with 100% Correct Answers | Latest Version 2024 | Verified
According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. - Equal According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. - 4.5 This legislation covers hazardous substance, site contamination, and cleanup - Comprehensive environmental recovery, compensation, and liability act. A blueprint showing the exact route of a pipeline and virtually all of the knowledge that exist for that pipeline when constructed is called a ______________? - Alignment sheets In area is considered oxygen deficient if the oxygen level is below ___________ % - 19.5 During a pressure test, if a leak develops on a connection, yomust depressurize to a safe level and then - re-tighten the connections Which listed non-destructive testing method is specified in API 1104? - RT examination Prior to a hydrotest, ensure that the _______ has approved the de-watering location. - Environmental Inspector As an inspector, you should ensure that there is always a (n) on a site with an open excavation. - designated competent person
Document information
- Uploaded on
- May 19, 2024
- Number of pages
- 14
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers