-The ICC catalog entry for the Special Inspector General Requirements (GR)
module states that this is an _____ exam. Indicating it is a _____ test type. -
-"Open Book" , navigational
Navigational means knowing where to find the answer is just as important as
knowing the answer. There is not enough time to look up every question.
-The ICC catalog entry for the General Requirements (GR) module shows
additional information under _____ and _____ . Reference materials allowed
during the exam are The _____ and The _____ . This exam will focus on _____ ,
_____ , and _____ . - -Info and Outline
International Building Code (IBC) , Special Inspection Manual (SIM)
"Duties and Responsibilities" , "Notification of Discrepancies" , and
"Inspection Reports"
-The type and extent of each special inspection shall be located in - -the
Statement of "Special Inspections"
IBC 1704.3.1
-Who has the legal authority to enforce the "Special Inspections" provisions
of the building code? - -building official
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official"
-Who can hire an approved inspection agency? - -Owner or owners agent
IBC 1704.2
, -Who can perform a structural observation? - -Registered design
professional
IBC 1704.5
-Who is required to receive the final report? - -Building Department
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official""
-One of the TASKS performed by the special inspector AT THE JOBSITE
includes posting "Stop Work" notices for "Non-conformance" work observed.
- -False
SIM 2012 Ch 2 "At the Jobsite"
-Who is responsible for providing access to the approved plans? - -
Contractor
SIM 2012 Ch 3 "Duties and Responsibilities of the Contractor"
-Who shall the special inspector demonstrate competence to? - -The
Building Official
IBC 1704.2.1
-Who can issue a "Stop Work" order? - -Building Official
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official"
-What type of inspection is required for post-installed adhesive (epoxy)
anchors placed in a horizontal position to an existing 3000 PSI concrete wall?
- -Continuous inspection
IBC Table 1705.3
-The Special Inspector should include their proposed solution on a Daily
Inspection Report containing "Non-conformance" items? - -False
SIM 2012 Ch 2 "At the Jobsite"
-Discrepancies should be brought to the immediate attention of the - -
Contractor
IBC 1704.2.4
(ICC General Requirements (GR) exam for
Special Inspectors information and study
questions)
Daily Affirmation - -*I am smart enough, I can do this.*
*It's not rocket surgery or brain science.*
*It's not that hard, just difficult.*
*I may need extra work or more practice.*
*I don't need to be perfect, I just have to try.*
-The ICC catalog entry for the Special Inspector General Requirements (GR)
module states that this is an _____ exam. Indicating it is a _____ test type. -
-"Open Book" , navigational
Navigational means knowing where to find the answer is just as important as
knowing the answer. There is not enough time to look up every question.
-The ICC catalog entry for the General Requirements (GR) module shows
additional information under _____ and _____ . Reference materials allowed
during the exam are The _____ and The _____ . This exam will focus on _____ ,
_____ , and _____ . - -Info and Outline
International Building Code (IBC) , Special Inspection Manual (SIM)
"Duties and Responsibilities" , "Notification of Discrepancies" , and
"Inspection Reports"
-The type and extent of each special inspection shall be located in - -the
Statement of "Special Inspections"
IBC 1704.3.1
-Who has the legal authority to enforce the "Special Inspections" provisions
of the building code? - -building official
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official"
-Who can hire an approved inspection agency? - -Owner or owners agent
IBC 1704.2
, -Who can perform a structural observation? - -Registered design
professional
IBC 1704.5
-Who is required to receive the final report? - -Building Department
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official""
-One of the TASKS performed by the special inspector AT THE JOBSITE
includes posting "Stop Work" notices for "Non-conformance" work observed.
- -False
SIM 2012 Ch 2 "At the Jobsite"
-Who is responsible for providing access to the approved plans? - -
Contractor
SIM 2012 Ch 3 "Duties and Responsibilities of the Contractor"
-Who shall the special inspector demonstrate competence to? - -The
Building Official
IBC 1704.2.1
-Who can issue a "Stop Work" order? - -Building Official
SIM 2012 Ch 3 "Duties and Responsibilities of the Building Official"
-What type of inspection is required for post-installed adhesive (epoxy)
anchors placed in a horizontal position to an existing 3000 PSI concrete wall?
- -Continuous inspection
IBC Table 1705.3
-The Special Inspector should include their proposed solution on a Daily
Inspection Report containing "Non-conformance" items? - -False
SIM 2012 Ch 2 "At the Jobsite"
-Discrepancies should be brought to the immediate attention of the - -
Contractor
IBC 1704.2.4