Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

Building Construction Exam 2 with correct answers 2024

Document preview thumbnail
Preview 1 out of 2 pages

What is not a type of deep foundation? - answer-spread footing What would be constructed with a flared bottom when used in clay soil to improve its bearing capacity? - answer-belled caisson What pile would have one of the lowest capacity based strength of the material it is made from? - answer-Timber pile What type of portland cement should be used in a concrete mix when the concrete must gain strength as fast as possible so that a contractor can strip forms as soon as possible? - answer-Type 3 What ingredient in a batch of normal weight concrete makes up from 60 to 80% of the volume? - answer-the aggregates What is performed on the jobsite to test the consistency of concrete at the it is delivered? - answer-slump test what type of portland cement is used when a massive concrete element like a mat foundation or a dam wall is being cast and the heat build up within the concrete must be minimized? - answer-Type 4 when a slab is placed and finished, what operation comes immediately after the concrete is screeded? - answer-bull floating when a slab is being placed and finished, screeding is done using what? - answer-a straight edge what is not among the identification marks found on steel reinforcing bars? - answer-weight per lineal foot what is required in order to produce quality concrete? - answer--correct proportioning of the ingredients -adequate mixing - careful placing and consolidating -maintaining adequate moisture for curing what concrete elements would welded wire fabric most likely be used for reinforcing? - answer-floor slabs Which type of joint would be required when a large slab contains so much concrete that it must be poured on two separate days and there is to be no movement allowed between the two separate sections once the concrete has hardened? - answer-construction joint in a high rise building, dead load can be significantly reduced by using lightweight concrete. In what building elements would the architect or engineer often specify the use of lightweight concrete? - answer-floor slabs above grade what is used to place concrete for large slab on grade would be the slowest method and result in the lowest placement rate? - answer-wheelbarrow


Document information

Uploaded on
May 1, 2024
Number of pages
2
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
85
Last sold
-




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.