• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Cssm Test Review With Answers

Document preview thumbnail
Preview 2 out of 11 pages

What is the definition of soil and foundation work? - correct answer-Grading in soil or installing underpinning, Augering in soil or removing sheeting, Excavating and drilling in soil or rock When contractors use light duty two-point adjustable suspended scaffolds in NYC, what - correct answer-¾'' grade #1 unspliced manila rope At what grade must power buggy brakes be capable of being fixed in engagement to hold a full load stationary? - correct answer-25% grade The definition of _____________ is: a horizontal transverse scaffold member (which may be supported by legs or runners) upon which the scaffold platform rests and joins scaffold uprights, posts, poles, and similar members - correct answer-Bearer (putlog) The deck and the substantial enclosure of a sidewalk shed shall be extended parallel to the curb at least 20 feet beyond the building line when construction is_______ - correct answer-greater than 100 feet In structures undergoing demolition, how must the existing sprinkler system be maintained - correct answer-Non-automatic and Siamese hose connections shall be marked by a metal sign reading "Sprinkler Siamese Connection" and by a red-light bulb at night A ramp for a power buggy must be designed to support how many times the maximum intended live load - correct answer-4 The permanent floors of skeleton steel construction shall be installed as soon as possible as steel installation progresses. In no case shall there be more than _________ or equivalent levels or __________, whichever is less, between the erection floor and the uppermost permanent floor. - correct answer-8 stories, 120 feet If an open excavation has been discontinued or interrupted for at least ___ months, the lot shall be filled and graded to eliminate all steep slopes, holes, obstructions, or similar sources of hazard. - correct answer-3 Excavated material and superimposed loads such as equipment, trucks, etc., shall not be placed closer to the edge of the excavation than a distance equal __________ the depth of such excavation, unless the excavation is in rock or unless the sides of the excavation have been sloped or sheet piled (or sheeted) and shored to withstand the lateral force imposed by such superimposed loads. - correct answer-to one and one-half times The Commissioner shall inquire into the cause of any accident involving equipment. When an accident involves any piece of equipment on the site, no person shall do the following without the permission of the Commissioner: - correct answer-Use such equipment or remove the equipment or any part thereof from the area of the job site According to 3314.8.2, the scaffold shall be enclosed with debris netting consisting of a wire screen comprised of not less than _____ wire mesh, or equivalent synthetic with a maximum _________ mesh. - correct answer-No. 18 steel, one-half inch According to NYC DOB, how many years is the 32-Hour Rigging Supervisor Training valid for and how many hours is the required refresher course? - correct answer-4 years and 16 hours Specific to foundation operations that affect adjacent properties: The owner of the property that may be affected shall be given ____ days written notice of the intention to perform such operations. - correct answer-10 According to Chapter 3301, any construction equipment that would affect public safety must be inspected before use with the exception of - correct answer-Hand tools Who shall inspect construction equipment that might affect public safety before it is used for a specific job at the construction site? - correct answer-Competent person designated by the contractor


Document information

Uploaded on
April 30, 2024
Number of pages
11
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ascorers
4.7
(1164)
Sold
1603
Followers
74
Items
3776
Last sold
2 days ago

Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.