Advanced Crane & Rigging Test Questions and Answers 100% Correct
Advanced Crane & Rigging Test Questions and Answers 100% Correct When should an approved lift plan be re-approved? - D. If there is any deviation from the original lift plan. Electrical hazards in the lift area and swing direction and degree are factors to consider in preparing which portion of a lift plan? - D. Crane Placement Capacities for crawler cranes that have outrigger extensions may not exceed ________. - D. 85 perfect of tipping When planning a lift involving two cranes, calculate the lowest net capacities that both cranes will have during the lift. The next step is to ______. - A. Make sure that the sum of the lowest rated net capacities of the cranes exceeds the load weight. A lift plan should be discussed ______. - D. At a pre-lift meeting where all personnel in the lift are present. What is meant by the term "two blocking?" - B. The load block contacts the boom point sheaves
Written for
- Institution
- Advanced Crane
- Course
- Advanced Crane
Document information
- Uploaded on
- April 27, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
advanced crane rigging test
Also available in package deal