CISEC Exam Test Review 2024
CISEC Exam Test Review 2024 LDP - ANS-Land Developing Projects - altering landscape for projects such as agriculture or housing ect. NPDES - ANS-National Pollutant Discharge Elimination System - section of the CWA (Clean Water Act) to permit stormwater discharges associated w industrial activities PER permit CWA Penalty Types - ANS-Adminstrative Class I. Neglegent Class II. Knowlingly = greater fines What documents are required on site? - ANS-- SWPPP - CGP - Site Map - Drawings and Key - All inspection reports - Any amendments to SWPPP Who is the "operator"? Also the LRP. - ANS-Usually the OWNER of the site, not the contractor, unless authorized by the owner to general contractor to have day-to-day operational control! When do you need permit coverage? - ANS-Required from start to end of project. "End" being the final vegetative/non-vegetative (concrete) stabilization occuring. For any project one acre or greater. Large Land Development - ANS--strips off all existing vegetation a.k.a site carving -usually on hillsides and steep slopes -installation of untilities that tear up large areas of land Vertical Projects - ANS-- Homebuilding, smaller residence construction projects -usually multiple subcontractors -requires lots of housekeeping = mass choas Bix Box Projects - ANS--commercial buildings -mass grading and mass choas -highly visible w/ fairly large footprint Linear Projects - ANS... Continues...
Escuela, estudio y materia
- Institución
- CISEC
- Grado
- CISEC
Información del documento
- Subido en
- 24 de abril de 2024
- Número de páginas
- 15
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
- cisec
-
cisec exam test review 2024