GCSS Army PRACTICAL EXERCISE – CPE Questions with 100% Correct Answers | Latest Version 2024 | Verified | Ace the Test
3.Which A (Aging) indicator displays in the recoverable/ reparable conversion by YOBUX TRANSATION IF THE RETURN (ZRL/ZRX) PR is 36 days old C. RED 4.What screen title displays in the initial screen of the migo transaction . A. The screen title depends on the last movement type that was posted. is the menu path used to enter time confirmation and complete a work order. A. Order>confirmation >overall completion confirmation number is associated with the status that is used to deadline the equipment. A. 30 7. When creating a dispatch (d1) notification , what cannot be done before the notification is saved and the notification number is generated C .the equipment dispatch 5987 form cannot be printed
Escuela, estudio y materia
- Institución
- GCSS Army
- Grado
- GCSS Army
Información del documento
- Subido en
- 17 de abril de 2024
- Número de páginas
- 7
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
gcss army practical exercise cpe questions with
Documento también disponible en un lote