Scaled Agile Framework / SAFe Scrum Master Certification Prep (SSM)

Document preview thumbnail
Voorbeeld 2 van de 10 pagina's

Scaled Agile Framework / SAFe Scrum Master Certification Prep (SSM) job sequencing the key to economic outcomes WSJF weighted shortest job first How do you calculate WSJF? WSJF = CoD (estimated value) / Duration (time to ship or Job Size) RR risk reduction OE opportunity enablement How to calculate CoD? CoD = User-business value + Time criticality + RR & OE value / Job Size or "Duration" PI program increment NFR non functional requirement 3 Pillars of Scrum transparency, inspection, adaptation Scrum values make these things transparent: process, workflow, progress The 5 SAFe Scrum Values are... courage, focus, openness, commitment, respect SAFe Iteration length 2-4 weeks Team composition does not change during an Iteration, otherwise the ____ is invalid. velocity product owner owns, prioritizes and manages the TEAM backlog team increment a thin vertical slice of functionality Three roles in Agile teams scrum master, product owner, development team Typical development team size in Scrum 3-9 excluding the scrum master and product owner The promise of SAFe Synchronizes alignment, collaboration, and delivery for large numbers of teams 4 core values of SAFe built-in quality, program execution, alignment, transparency 9 SAFe Lean-Agile principles 1. take an economic view 2. apply systems thinking 3. assume variability; preserve options 4. build incrementally with fast, integrated learning cycles 5. base milestones on objective evaluation of working systems 6. visualize and limit WIP, reduce batch sizes, and manage queue lengths 7. apply cadence, synchronize with cross domain planning 8. unlock the intrinsic motivation of knowledge workers 9. decentralize decision making Agile Release Train a virtual organization of 5-12 teams (50-125+) that plans, commits, and executes together program increment duration a fixed timebox with a default of 10 weeks. RTE role acts as chief scrum master for the train product manager owns, defines, and prioritizes the PROGRAM backlog system architect/engineer provides architectural guidance and technical enablement to the teams on the train business owners key stakeholders on the agile release train 4 program events PI planning ART sync System Demo Inspect and Adapt event PI planning timebox 2 days art sync timebox 1 hour system demo timebox 2 hours inspect and adapt event the train reviews and improves its process before the next PI pdca plan, do, check, act PI planning cadence 2 days every 8-12 weeks (10 is typical) Product Management role in PI owns feature priorities Development teams role in PI own story planning and high level estimations Two things every feature has benefit hypothesis and acceptance criteria benefit hypothesis justifies feature implementation cost and provides business perspective when making scope decisions When is acceptance criteria typically defined? during program backlog refinement What are the 3 C's of user stories? card, conversation, confirmation What are the 3 components of user stories? role, activity, value Roles in user stories can be comprised one of the following (3). people, devices, systems What does INVEST mean in user stories? Independent Negotiable Valuable Estimable Small Testable Enabler stores support value and represent Exploration, Architecture, and Infrastructure refactoring a systematic approach to improving the system without changing observable behavior spike research activities to reduce risk, understand a functional need, increase estimate reliability, or define a technical approach Story points represent these (4) things... Volume - how much is there Complexity - how hard it is Knowledge - what we know Uncertainty - what we don't know The PI planning event helps create ____ to a common mission alignment Risks should be evaluated with the ROAM format, which stands for... Resolved Owned Accepted Mitigated stretch objectives provide a reliability guard band are included velocity/capacity are planned (aren't "extra") are NOT included in commitment SMART Specific Measurable Achievable

Voorbeeld van de inhoud

Scaled Agile Framework / SAFe Scrum
Master Certification Prep (SSM)
job sequencing
the key to economic outcomes
WSJF
weighted shortest job first
How do you calculate WSJF?
WSJF = CoD (estimated value) / Duration (time to ship or Job Size)
RR
risk reduction
OE
opportunity enablement
How to calculate CoD?
CoD = User-business value + Time criticality + RR & OE value / Job Size or "Duration"
PI
program increment
NFR
non functional requirement
3 Pillars of Scrum
transparency, inspection, adaptation
Scrum values make these things transparent:
process, workflow, progress
The 5 SAFe Scrum Values are...
courage, focus, openness, commitment, respect
SAFe Iteration length
2-4 weeks
Team composition does not change during an Iteration, otherwise the ____ is
invalid.
velocity
product owner
owns, prioritizes and manages the TEAM backlog
team increment
a thin vertical slice of functionality
Three roles in Agile teams
scrum master, product owner, development team
Typical development team size in Scrum
3-9 excluding the scrum master and product owner
The promise of SAFe
Synchronizes alignment, collaboration, and delivery for large numbers of teams
4 core values of SAFe
built-in quality, program execution, alignment, transparency
9 SAFe Lean-Agile principles
1. take an economic view
2. apply systems thinking

, 3. assume variability; preserve options
4. build incrementally with fast, integrated learning cycles
5. base milestones on objective evaluation of working systems
6. visualize and limit WIP, reduce batch sizes, and manage queue lengths
7. apply cadence, synchronize with cross domain planning
8. unlock the intrinsic motivation of knowledge workers
9. decentralize decision making
Agile Release Train
a virtual organization of 5-12 teams (50-125+) that plans, commits, and executes
together
program increment duration
a fixed timebox with a default of 10 weeks.
RTE role
acts as chief scrum master for the train
product manager
owns, defines, and prioritizes the PROGRAM backlog
system architect/engineer
provides architectural guidance and technical enablement to the teams on the train
business owners
key stakeholders on the agile release train
4 program events
PI planning
ART sync
System Demo
Inspect and Adapt event
PI planning timebox
2 days
art sync timebox
1 hour
system demo timebox
2 hours
inspect and adapt event
the train reviews and improves its process before the next PI
pdca
plan, do, check, act
PI planning cadence
2 days every 8-12 weeks (10 is typical)
Product Management role in PI
owns feature priorities
Development teams role in PI
own story planning and high level estimations
Two things every feature has
benefit hypothesis and
acceptance criteria
benefit hypothesis

Documentinformatie

Geüpload op
15 april 2024
Aantal pagina's
10
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$3.49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MedTestPro
3.6
(8)
Verkocht
67
Volgers
30
Items
4328
Laatst verkocht
4 dagen geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen