Asphalt Paving Level 1 Test with 100% Verified solutions| Graded A+
A full lot of super pave asphalt is what size? 1,000 tons 1,000 to 2000 tons 2000 to 4000 tons 1 days production - 2000 to 4000 tons Which is not typically used as an asphalt binder in fdot mix designs? PG 52-28 PG 58-22 PG 62-22 PG 76-22(PMA) PG 82-22 (PMA) - PG 62-22 Who cuts the density cores used for verification testing? The verification technician The contractor The independent verification testing technician None of the above - The contractor A full lot is composed of 5 sublots and 4 cores per lot T/F - FalseWhat is the most important for consistent compaction of asphalt mix? The mix is hotter in temperature The mix is colder in temperature The mix is uniform in temperature Temperature of the mix does not affect compaction - The mix is uniform in temperature Referring to general stationing guidelines, R1 would be ____ than R2 Closer to centerline Closer to outside shoulder Closure to the inside shoulder Both A and C - Both A and C While using the rolling straightedge, if the needle goes in the red zone indicating an unacceptable high spot in the section, you then - Mark the pavement where the needle first goes into the red zone and place another mark where the needle leaves the red zone and continue For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on the bridge deck. 1 inch Exactly 1/2 of the straightedge The entire straightedge None of the above - 1 inch
Document information
- Uploaded on
- April 11, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers