300 N E I E P || All Correct.
A shipping crate is a cube with volume 64 ft3. What is the internal height of the crate? correct answers 4 ft. The cost of the bolts used to fasten the panels in an elevator cab is $5 for 4 bolts. If a particular job calls for 80 bolts, what is the cost? correct answers $100 One amp is equal to 6,240,000,000,000,000,000 electrons per second. Write this rate using scientific notation. correct answers 6.24 x 10 18th power electrons per second The plans for the installation of cab walls call for two different size panels. The large panels require 12 bolts and the small panels require 8 bolts. If each car has 6 large panels and 4 small panels, how many bolts will be needed? correct answers 104 bolts A salesperson makes 22% commission on their total sales. If one month, the salesperson sold a total of $45,000 in goods, what is their commission? correct answers $9,900.00 Five different pipes have lengths 3 ¼ ft., 4 ⅝ ft., 2 ½ ft., 4 ¾ ft. and 2 5⁄16 ft. What is the total length of the pipes? correct answers 17 7⁄16 ft. A 13 ft. I-beam needs to be cut into 4 equal pieces for blocking beams. What should each beam measure? correct answers 3.25 ft. How many license plates are possible if each plate number is comprised of two letters followed by three numbers, where repetition of both numbers and letters is allowed? hint - 26 letters in alphabet, so that means 26x26 Three numbers, 10 digits possible (0-9) 10x10x10 correct answers 676,000 Each outlet in an office building can handle 30 amps without being overloaded. If the office building has 250 outlets, represent the total amps in terms of kA. correct answers 7.5 kA The hole for each bolt on a panel is 12500 μm in diameter. Express this diameter in millimeters. correct answers 12.5 mm For a series of tasks, the projected times for several projects are the following: 1 hour 45 minutes, 3 hours 20 minutes, 45 minutes, 2 hours 20 minutes, and 1 hour 40 minutes. What is the total time for these projects? correct answers 9 hours 50 minutes Convert 1.34 x 1013 μm to Mm. correct answers 13.4 Mm A particular task is scheduled to take 4 hours 15 minutes. You and your team finish the job in only 2 hours 34 minutes. How much time did the team have to spare? correct answers 1 hour 41 minutes
Document information
- Uploaded on
- April 9, 2024
- Number of pages
- 25
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers