SHP final Test guide 2024 graded A
True - The firefighter may be installed next to a stand-alone battery smoke detector False - When performing a full system test, you may bypass any open doors or windows Always enable the emergency - When programming an skey1,you must False - When running power to the take345,polarity doesn't apply Audible alarm (7) - When programming the emergency key for the skey1,which zone/sensor type is used. True - When installing a smkt3,you must use the included screws and anchors True - When installing the firefighter, it is required to test the customers existing smoke detectors Between 6"(15cm) and 2'(61cm) from floor - When installing a Dw21, where is the approved location for the sensor Provided double sided tape - When installing a dw11 on a vinyl or metal frame, what should primarily use to mount the sensor Beans & wire caps - Which of the following materials can you use to group multiple ground terminals in a takeover. Smoke detector - Which of the following sensors are you not allowed to program using a translator True - When installing the take345, you must always test the new 12v battery before using it. 16.5 - What is the output voltage of transformer used to power the sky control 12" - What is the minimum distance for placement of a co3 from the corners of the wall False - The smkt3 has 2 function:smoke and heat detection Loop 1 Zone 14 - How would you program a co3 if mounted on a hallway wall False - When installing a translator, you must program all of the existing sensors as new equipment on the panel True - The dw21 should always be installed in the door frame (09) Smoke detector. (09) Heat detector. (08) Freeze - Which of the following zone/sensor types are correct when programming an smkt3 7ft - What it the correct height ar which to install the Pir2 Loop 2 - When programming a Dw21 what loop number is used True - When programming a sensor into a sky control panel, you can type in the serial number or learn it in by triggering the device. Loop 1 Zone 3 - How would you program a gb2 when it is mounted on a master bedroom ceiling True - Panic pendants are programmed as an audible alarm(type 07) True - When installing the take 345 you must ensure that the transformer is supplying power to the power supply before connecting the battery True - When wiring the take 345 you must ensure it has three points of ground: the low side of each zone, the takeover module, and the power supply True - You are required to test all secondary keypads and key fobs even though they are not detection devices 3/4" - When installing a dw21, what size drill bit should you use to drill the hole for the sensor
Document information
- Uploaded on
- April 4, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers