LP Gas Master Qualifier: Dispensing Installation & Maintenance Exam Questions And Answers 2024
LP Gas Master Qualifier: Dispensing Installation & Maintenance Exam Questions And Answers 2024 The point of transfer at a dispensing unit must be ____ from Public ways, including public streets, highways, thoroughfares, and sidewalks. A. 10 feet B. 15 feet C. 25 feet - answerA. 10 feet Steel supports on vertical ASME containers shall be protected against fire exposure with a material having a fire resistance rating of a least _____, except that continuous steel skirts that have only one opening that is 18 in. or less in diameter shall have fire protection applied to the ______ of the skirts. A. 3 hrs; outside B. 2 hrs; outside C. 3 hrs; inside - answerB. 2 hrs; outside Pressure relief devices installed in underground containers serving dispensing systems shall be piped vertically upward to a point at least _____ above the ground. A. 2 feet B. 6 feet C. 10 feet - answerC. 10 feet A remote emergency shut off device for either the internal valve or emergency shutoff valve is required to be located not less than _____ or more than _____ from the liquid transfer point. A. 10 ft ; 50ft
Geschreven voor
- Instelling
- LP Gas Master Qualifier
- Vak
- LP Gas Master Qualifier
Documentinformatie
- Geüpload op
- 3 april 2024
- Aantal pagina's
- 3
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
lp gas master qualifier dispensing installation
Ook beschikbaar in voordeelbundel