ARE 5.0 PCM Exam with 100% Correct | Latest Updated Graded A+
Party Dispute - Problems that arise on a project (i.e. delays, failures, fee controversies) Administrative Proceeding - Problems that arise from civil statutes (i.e. licensing, code compliance, regulations) Standard of Care - What a reasonably prudent architect would do, in the same time and place, given the same or similar facts and circumstances. The law does not require perfection. Duty - A set of terms or requirements that defines what one person "owes" another in a particular relationship. They are either stated (codified in contracts, building codes, building regulations, and zoning documents) or implied (manifested by following a code of ethics). Negligence - In order to prove negligence, the plaintiff must prove 4 things: duty, breach, cause, and damage. Statute of Limitations - Time limit within which a claim can be made. After the time limit, the claim is permanently barred. Each state has its own statute of limitations on construction claims against architecture, typically 3-10 years. Statute of Repose - Similar to a statute of limitations, except that the time limit is usually much shorter and doesn't begin until either the problem is first discovered or substantial completion.Betterment - Typically applies t
Document information
- Uploaded on
- March 31, 2024
- Number of pages
- 29
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers