CQHQ Study Test Questions with Correct Answers 3 parts of a criticality index - Answer-1. Frequency 2. Severity 3. Ease of detection Quantitative - Answer-Cost Qualitative - Answer-Experience (feelings) Quality assurance - Answer-Problem area or individuals. Focuses on the performance of workers, urging employees to strive for "zero defects" Quality Improvement - Answer-Focused of systems, processes or groups Flow chart - Answer-Diagram of a process Gnatt Chart - Answer-bar graph showing production managers what projects are being worked on and what stage they are in at any given time Histogram - Answer-a bar graph depicting a frequency distribution Determines whether the output of a process is distributed normally Force Field Analysis - Answer-Evaluating various processes for and against outlines the process of determining which forces drive and which resist a proposed change Root Cause Analysis - Answer-An analytical technique used to determine the basic underlying reason that causes a variance or a defect or a risk. A root cause may underlie more than one variance or defect or risk. Root Cause Analysis - Answer-Identifies gaps, use it after a sentinel event Type of analysis that starts with a result and then works backward to identify fundamental cause. Prevalence - Answer-The number or proportion of cases of a particular disease or condition present in a population at a given time. efficacy - Answer-Measures effectiveness Reaching consensus - Answer-Support by all members but does not have to be a unanimous vote team leader - Answer-Compile and turn in project, are responsible for project
Geschreven voor
- Instelling
- CQHQ
- Vak
- CQHQ
Documentinformatie
- Geüpload op
- 26 maart 2024
- Aantal pagina's
- 6
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
- cqhq
- cqhq study test
- cqhq study test questions
-
cqhq study test questions with correct answers