• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

ProPrac Test 2

Document preview thumbnail
Preview 2 out of 14 pages

ProPrac Test 2 In which project specification division would you expect to find windows: - 08 In which project specification division would you expect to find structural steel: - 05 The Architect's responsibility in review of a submittal provides for the following: - Limited checking for conformance with the contract documents Which is not a responsibility of the architect during the Construction phase: - Establish means and methods In which phase does the design team work out clear, coordinated description of the design including fully developed floor plans, sections, exterior elevations, wall sections and key details but not final details or comprehensive interior elevations: - Design Development Specifying end results that allow flexibility and creativity to meet requirements instead of describing exact characteristics or specific named products is known as: - Performance Specifying The specification 00 section that establishes a consistent understanding of the procedures that bidders should follow in preparing their bids such as consideration of bids is: - Instruction to Bidders The right for the owner to reject any or all bids is typically included in the bidding documents: - True The contractor determines the date of Substantial Completion: - False Who typically provides project record documents during project close‐out: - Contractor The variation of Design-build common in Europe and Japan where an owner contracts with an architect for schematic design and technical review during design and construction before handing the project over at design development to a design-build entity is known as: - Bridging According to the textbook author Paul Segal, FAIA, on the majority projects, who is the most effective Project Manager: - Architect According to a survey of construction project owners, approximately what proportion of projects fail to meet either budget, schedule or both: - 1/3 Which are TRUE statements of Integrated Project Delivery (IPD): - 1) Professional Liability Insurance companies have problems underwriting IPD project delivery methods 2) IPD cannot work without a committed owner who must have knowledge of the industry Which of the following are examples of Unqualified Language that potentially alters the standard that the architect is held to: - 1) The masonry walls have been completed 2) 100% complete Construction Documents In which of these project delivery methods does the architect usually complete their construction documents prior to the construction contractors being determined: - Design-Bid-Build Which of the following is not a fundamental principal of Integrated Project Delivery (IPD): - Architect design control According to the McGraw Hill, the top cause of disputes on infrastructure projects is: - Changes in the scope of work Which item(s) impact the cost of professional liability insurance premiums: - 1) Billing volume 2) Project type 3) Geographic location 4) Coverage limits If total overhead is $341,000 and direct labor expense is $218,000, your break even multiplier is: - 2.56 Using less traditional procurement methods such as construction managers, multiple primes and fast-track or phased construction: - 1) Often results in increased


Document information

Uploaded on
March 21, 2024
Number of pages
14
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExcellentScores
3.8
(76)
Sold
306
Followers
227
Items
4200
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.