• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

NASCLA Practice Exam Set With Correct Solutions

Document preview thumbnail
Preview 1 out of 4 pages

NASCLA Practice Exam Set With Correct Solutions Balance sheet, income statement, statement of cashflow - CORRECT ANSWER-Three types of financial statements Sustainable practices - CORRECT ANSWER-specifically consider a building project's long term impact on the environment Board feet - CORRECT ANSWER-The volume of wood needed for a project Design-Build method of project delivery - CORRECT ANSWER-Owner contracts with one entity to provide both design and construction services. Design-build firm subcontracts as necessary. Unit Price Contract - CORRECT ANSWER-An agreement that divides a contract into various quantities of work categories for the contractor to perform cost-plus contracts - CORRECT ANSWER-adding a standard markup (set percentage added) to the cost of the product rather than have companies compete for the lowest bid; allowed for faster mobilization because companies made higher profits from producing more/fast Labor rate - CORRECT ANSWER-The most difficult factor to determine the ___ because both the hourly wage rate and crew productivity must be considered Turnkey contract - CORRECT ANSWER-a method of organizing a building project in which a contractor and a designer agree to provide a finished building at an agreedupon price. 1/4 inch tolerance - CORRECT ANSWER-The tolerance for the spacing of trusses along bearing support must be within plan dimension. Field conditions that force spacing beyond this tolerance shall be reviewed and approved by the Building Designer and Truss Designer 300 psi - CORRECT ANSWER-Adobe average compressive strength Cost Estimate and Job Cost System - CORRECT ANSWER-The most efficient ways to keep an eye on money going in and out 36% - CORRECT ANSWER-The estimated percentage that green building use less than conventional buildings


Document information

Uploaded on
March 13, 2024
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyCenter1
4.3
(29)
Sold
233
Followers
91
Items
3811
Last sold
19 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.