MSSC Quality Pratice Test 2 Correct 100%(RATED A+)
What should a receiving inspector do if incoming material is found to be nonconforming? -ANSWER Reject the material Sampling plans are determined by -ANSWER Frequency chart When connected to a PC, a digital caliper can be used to -ANSWER Collect SPC data ECN stands for -ANSWER Engineering Change Notice Adjusting an instrument or device to a standard is called -ANSWER Calibration To ensure the accuracy of a Standard Operating Procedure it needs to be -ANSWER Validated and approved Multiple people sign off on Corrective Action Reports in order to Ensure -ANSWER That the information is accurate Adjustments in follow-up with product quality checks are necessary in a/an _____ non-conformity -ANSWER Product process and system What is ISO 9000 -ANSWER documents standards written within an organization To eliminate indicator measurement error a device called a _____ ____ is used as the reference part. -ANSWER Gauge block Who is an inspection report issued to when an inspected sample does not meet specifications? -ANSWER The quality assurance representative What is the most important item to appear on the calibration label of a tool that is used to measure and test equipment -ANSWER The date the tool is due for calibration The hole shown in the graphic is a ____ hole. -ANSWER Counterbore The specific effect of a quality assurance system on a manufacturing department can be measured by -ANSWER Number of defects hich of the following measurement tools should be selected to measure a part that has a length specification of 1.625 inches +- .005? -ANSWER Micrometer
Written for
- Institution
- MSSC Quality
- Module
- MSSC Quality
Document information
- Uploaded on
- March 9, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
mssc quality pratice test 2 correct 100rated a
-
mssc quality pratice test 2 correct stuvia
Also available in package deal