• Verkeerd document? Gratis ruilen
  • Geschreven door studenten die geslaagd zijn
  • Direct beschikbaar na je betaling
  • Online lezen of als PDF
Verkopen
Kies je studieland
Kies je taal
Document preview thumbnail
Voorbeeld 2 van de 11 pagina's
Tentamen (uitwerkingen)

NCCCO Core Exam Marking Scheme Updated

Document preview thumbnail
Voorbeeld 2 van de 11 pagina's

NCCCO Core Exam Marking Scheme Updated Which of the following is an accurate statement about luffing jibs? - ANSWER- It raises and lowers independent from the boom What is the weakest quadrant of a boom truck? - ANSWER- Front What effect would blocking up the ends of the tracks have on a crane? - ANSWER- It would increase capacity over the ends The tipping axis of a crawler crane is? - ANSWER- It depends if the idler or sprocket are offset from track rollers According to ASME B30.5 what percentage should not be exceeded on a mobile crane during a load test? - ANSWER- 100% From strongest to weakest put the following hitches in order - ANSWER- Basket, vertical, choker Which of the following should synthetic slings not be used around? - ANSWER- Acid How often should you inspect a running rope? - ANSWER- Daily The radius on a crane chart refers to? - ANSWER- Center of rotation to center of gravity of the load or hook What percentage is the manufacture rate of capacity of a mobile crane on outriggers? - ANSWER- 85% What percentage is the manufacture rated capacity of a rough terrain crane on rubber? - ANSWER- 75% What is Lay length? - ANSWER- The distance required for a strand to make a complete revolution around the rope What is one problem lubricating wire rope can cause? - ANSWER- Obstructed view when inspecting the rope What would What would call for a running rope to be taken out of service? - ANSWER- Six randomly distributed broken wires and one Lay or three in one strand and one lay Which of these is known as a standing rope? - ANSWER- Pendant line If you are at a radius below the bold line on a load chart, which does that mean? - ANSWER- Tipping, stability To lift personnel, he must have an anti-two block on the crane? - ANSWER- True The personal platform must be proof tested to _________ Of the platforms rated capacity - ANSWER- 125% The crane must be D rated ______ To lift personnel - ANSWER- 50% When lifting personnel, how should the rigging be a attached to the hook? - ANSWER- With master link When using wire rope slings, the eye of the slings shall have? - ANSWER- Thimbles The crane operator should respond to the stop signal from anyone - ANSWER- True On a rough terrain crane what is the strongest quadrant? - ANSWER- Front If an operator does not boom up to allow for a boom deflection, the load will? - ANSWER- Move away from the Crane Where should the boom be positioned when beginning a lift? - ANSWER- Directly over the center of gravity of the load A crane should always be barricaded within? - ANSWER- The swing radius of the rear of the rotation superstructure counterweight The crane must have a ______ inspection performed both monthly and yearly. This information must be documented by the employer that conducts the inspection. - ANSWER- Periodic Slings should always be marked with a capacity rate in tag. - ANSWER- True The wire rope clip on a wedge socket Should always attached to the _______ Of the Crane. - ANSWER- Dead end It is possible for a crane to be overloaded with no signs of tipping. - ANSWER- True In rotation resistant ropes if you have ______ broken wires and six rope diameter or _______ broken wires and 30 rope diameters, the rope must be removed from service. - ANSWER- 2,4 In order to operate a mobile crane on a barge, you must have - ANSWER- List and trim capacity chart When lifting a load out of the water, the load will be come ________ When it breaks the surface - ANSWER- Heavier What must be done when operating on a barge? - ANSWER- Attach the crane to the barge Mobile crane is more stable when: - ANSWER- The cranes leverage is greater than the load leverage


Documentinformatie

Geüpload op
8 maart 2024
Aantal pagina's
11
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$12.49

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EllenPoole
3.7
(73)
Verkocht
409
Volgers
187
Items
12123
Laatst verkocht
8 uur geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen

Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.