Nascla and GENERAL CONTRACTOR A Exam Questions with 100% Correct Answers
Nascla and GENERAL CONTRACTOR A Exam Questions with 100% Correct Answers In built up roofs, cant strips shall extend how many inches up the vertical surface? - answer5" Air entertainment should always be specified for concrete exposed to what? - answerFreezing and thawing In a post tensioning environment, when a two-stroke pull is required, the final pull should be pre-calculated to use no more than what percentage of the full stroke of the jack on the final pull? - answer60% Tack or spot welding can reduce the strength of a bar to what percent of its original capacity? - answer35 - 40 % The advantage of nuclear compaction testing is? - answerYou do not have to remove the soil from the site how many gallons of flammable liquids shall be stored in a room outside of an approved storage cabinet? - answer25 A ______ bond will ensure the contractor that wins the project will draw up and put into action the contract at the bid price and submit performance and payment bonds. - answerBid A ______ bond promises that the contract will stay within the bounds of the contract until completion. - answerPerformance A bond that ensures the subcontractors and suppliers for a specific project will get paid and will liens from being enforced on said project. - answerLabor and Material Payment _______ ______ Insurance will safeguard the contractor just in case there is devastation or loss to a project before completion. - answerBuilders Risk ________ ________ will keep the claim amount from being more than the dollar amount covered by regular general liability or vehicle insurance. - answerUmbrella Liability Name one of the persons responsible for creating a estimate for a job. - answerProject Manager, Superintendent The part of a project, when creating a estimate, that is the toughest to plan for is the _____ _______. - answerlabor productivity The percentage of lumber used for framing that is typically wasted is ______. - answer10% Name one of the fundamental types of scheduling. - answerBar Chart, Network Diagram, Critical Path Schedule A _____ will show all of the activities that have to be completed in order for a project to be finished. - answerWBS, Work Breakdown Structure When working on a project there are certain things that must be done but are not on a deadline to complete, meaning it has a flexible schedule. What term would describe that flexibility? - answerfloat time A _____ ______ contract will allow the Owner a choice to reimburse the contractor when supplies are utilized within the scope of the project instead of when they are on the property. - answerFixed Price Just In Time delivery has a couple of benefits, name one of them - answerReduces risk of loss, prevents job site congestion Submitting that are to be provided in the last design phase include: (mark the best answer) - answercharts, drawings, samples, all of the above An FOB (Free On Board) Job Site increases the contractor's liability of supplies being lost or damaged. - answerFal
Written for
- Institution
- NASCLA
- Course
- NASCLA
Document information
- Uploaded on
- March 6, 2024
- Number of pages
- 12
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nascla and general contractor a exam questions wit
Also available in package deal