Nicet Level 2 questions 2024 with 100% correct answers
4 - correct answer Consider a room which is 40' square. How many 15cd wall mounted strobes are required to adequately cover this space? Annually - correct answer What is the testing frequency of a strobe? 15 - correct answer In a corridor application, visible appliances shall be rated not less than ________ cd? 4 hours - correct answer Consider a household fire alarm system where the primary power is provided by a circuit that can be switched off by means other than a circuit breaker. The battery must be recharged in____________ The control unit shall identify the affected detector when the compensation limit has been reached. - correct answer Where automatic drift compensation of detectors is provided: 3 - correct answer A fire alarm system requires the use of smoke detectors in a corridor. The corridor is 10' wide and 120' long. The ceiling of the corridor is smooth and flat and 10' high. What is the minimum number of smoke detectors in the corridor. One half smooth ceiling NFPA 72 17.7.3.2.4.2(2)bi pg 98 - correct answer The fire alarm system design for a room called for smoke detector spacing based on a smooth flat ceiling. Upon inspecting the room, it is determined that the ceiling has beams. The beam spacing is less than 40% of the ceiling height. NFPA72 permits smooth ceiling spacing in the direction parallel to the beams and __________ spacing in the direction perpendicular to the beams. 3 - correct answer The working drawings for a fire alarm system show that 2 duct detectors are required. The building is a single story with 4 HVAC units (1-5,000 cfm, 1-4000 cfm, 1-3000 cfm, 1-2000 cfm) How many duct detectors are required? 15 NFPA72 18.4.3.1 pg107 - correct answer The fire alarm system for a building requires the use of audible notification appliances for public mode notification. To ensure public mode signals are clearly heard, they shall have a sound level of at least _______ db above the average ambient sound level? Location of utilities - correct answer Site plans typically include: Level - correct answer A ceiling surface has a slope of 1 in 9. This is considered a ____________ ceiling. Division 16-Electrical - correct answer Which section of the contract documents typically contain fire alarm system requirements? 9 IBC Table 907.5.2.3.3, pg 224 - correct answer Consider a Group R-1 occupancy with 76 sleeping rooms. This building would require _______ sleeping accommodations with visible alarm notification? 1000 IBC 907.2.1.1 pg 216 - correct answer Activation of the fire alarm in a Group A occupancies with an occupant load of ______ or more shall initiate a signal using an emergency voice/alarm communication system?
Document information
- Uploaded on
- February 19, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers