California UST Service Technician Part 1 Exam Questions and Answers Update 2024/2025 (100% SOLVED AND GRADED)
California UST Service Technician Part 1 Exam Questions and Answers Update 2024/2025 (100% SOLVED AND GRADED) July 1 2005, service techs shall possess or work under someone who has a current certification indicating he or she has passed the ? - correct answers California UST service technician exam ICC cert must be renewed every? - correct answers 24 months Service techs must posses or be employed by a person who has the appropriate contractors license unless? - correct answers The individual has a Tank testing licens Service tech is defined by any individual who? - correct answers Test UST monitoring equipment Trouble shoots UST systems Installs UST monitoring equipment If the manufacturer training no longer exist , the local angency may? - correct answers Approve comparable alternat training . California UST Service Technician Part 1 Exam Questions and Answers Latest Update 2024/2025 (100% SOLVED AND GRADED) UST includes? - correct answers Tank and connected piping What is considered and UST - correct answers petroleum storage tank What UST system meets the requirements for secondary containment? - correct answers Doubled wall tanks According to title 23; the following piping components if installed after July 1 1987 must have secondary containment - correct answers Pressured product piping Considered "pipe" on tanks installed after July 1 2003 - correct answers Pressured product piping and below ground vapor recovery Under dispenser containment (UDC) was required for all UST systems by - correct answers December 31 2003 System for exchanging gas vapors in a storage tank and product in a fuel delivery truck - correct answers Stage 1 vapor recovery An approved method for non visual monitoring for existing UST systems. - correct answers Statistical Inventory Reconciliation (SIR) ATG must be capable for detecting a release of ? - correct answers .2 gallons per hour Manual inventory reconciliation. - correct answers No longer an approved method for non visual monitoring on existing UST systems Automatic line leak detectors installed on underground piping with secondary containment shall be capable of tetecting a leak of ? - correct answers 3 gallons per hour at 10 psi ATG should be programmed to test the tank ? - correct answers At least monthly According to PEI RP 300 a combustible gas can be used to ? - correct answers Detect vapor leaks in a vapor recovery system. According to PEI RP 300. A written scope of work for vapor recovery installation should include? - correct answers Construction plans Positive shut off overfill protection device must stop the flow of fuel when the tank is no more then ? - correct answers 95% full According to EO VR 201 A What could cause a nozzle shut off mechanism or malfunction? - correct answers Depended filter seal damage According to VR 201 A Breakaway reconnection must be ? - correct answers Logged in GDF log According to PEI RP 300 the following method of documenting piping location is NOT to ? - correct answers Sketch a diagram on the inside cover of vapor recovery equipment manual
Document information
- Uploaded on
- February 7, 2024
- Number of pages
- 12
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers