Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 25 pages
Exam (elaborations)

NERC Mixed Question 2024.

Document preview thumbnail
Preview 3 out of 25 pages

NERC Mixed Question 2024. The Disturbance Control Standard measures a Balancing Authority's response to a rapid loss of _____________. demand for energy. interchange. ACE. supply of energy. - ANSWER supply of energy A Balancing Authority's largest single contingency is a unit rated at 1,000 MW. Which of the following disturbances would constitute a reportable disturbance for Disturbance Control Performance evaluation based on the NERC DCS criteria? The loss of a 950 MW generating unit at 100% output. The loss of 3 generating units totaling 1,300 MW over a period of 3 hours. The loss of a 750 MW generating unit at 100% output. The loss of 715 MW of firm load. - ANSWER The loss of a 950 MW generating unit at 100% output. Balancing Authority informs the Reliability Coordinator that the projected load in a Balancing Area for the next four hours (over the morning peak) is trending above the available generation that had been committed for the day. Operating Reserves will be required to be converted into energy to cover the shortfall. Which Energy Emergency Alert (EEA) level should the RC declare? No EEA should be declared until load shed is expected. EEA 1 EEA 2 EEA 3 - ANSWER EEA 1 A Balancing Authority anticipating an operating capacity or energy emergency shall perform all actions necessary which includes: Bringing on all available generation All answers are correct Preparing to reduce firm load Postponing equipment maintenance - ANSWER All answers are correct As a Transmission Operator, you realize that the voltage level is starting to decline in the North West part of the system. Which of the following devices should you, as a Transmission Operator, be able to operate, and/or have another entity operate to raise the voltage level back to normal in the North West part of the system?


Document information

Uploaded on
January 14, 2024
Number of pages
25
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$8.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
83
Last sold
-


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.