Icc / Ust Questions With100 % Correct Answers | Verified
Corrosion Specialist - designs and certifies cathodic protection system Secondary containment shall be constructed to contain at least the following volumes: - A. 100% of usable capacity of primary where there is only one primary is within the secondary B. 150% of the largest container if there are multiple primary containers in a single secondary Cathodic protection tester will test cathodic protection system within __ months of installation and every __ years thereafter - 6 months 3 years Spill container shall meet the following requirements: - A. If made of metal, exterior wall shall be protected from galvanic corrosion B. Shall have minimum capacity of 5 gallons (19 L) C. Shall have drain valve which allows drainage of the collected spill into the primary container or provide means to keep spill cont empty Overfill prevention shall alert transfer operator when tank is __% full - 90% Flapper Valves shall provide positive shut off when tank is filled to no more than __% capacity - 95% Primary pressurized piping shall be tested for tightness hydrostatically at __% of design operating pressure - 150% Date that all UST systems must have Line Leak Detector installed - November 9,2004 Secondary containment testing shall be done upon ____, __months, and every ___ months or ____ years thereafter - Installation 6 months 36 months or 3 yearsOwners/ops shall submit SCT results to local agency within ____ days of completion - 30 days All monitoring equipment shall be tested, calibrated, operated, maintained, and certified every ____ months. - 12 months A person conducting UST monitoring equipment certification shall affix tag/sticker on each component and shall include ___ and ___. - Date certified, replaced or repaired Contractor/tank tester's license number LLD shall detect release of __ gph and ___ PSI within ___ hour - 3 gph 10 PSI Suction piping shall be tested every ___ years - 3 years Owners/ops of UST shall submit copy of ELD results to local agency within ___ days of completion of test - 60 days Within ____ hours of unauthorized release, owner/operator should notify ______. - 24 hours local agency Date that all UDC upgrades shall be completed - December 31, 2003 Tanks and piping which have been repaired shall be tested for tightness within ___ days of completion of repair - 30 days
Document information
- Uploaded on
- January 6, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers