• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

NERC Test 1questions With Complete Solutions

Document preview thumbnail
Preview 3 out of 18 pages

A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans? -Answer D. Regional Reliability Organization for the area. The transmission operator that you work for is installing new relays on some of their major transmission tie lines using newer technology. Who should your company notify before work is begun? -Answer C. Neighboring Transmission Operators, Balancing authorities, and Generator Operators. When shall the transmission Operators and balancing authorities review and update emergency plans? -Answer A. Annually When the responsible entity tags a dynamic schedule, what values should it use for the energy profile? -Answer Expected average MW profile for each hour. You are reliability coordinator in the eastern interconnection. Transmission Operator AB is in your Reliability Area. Transmission Operator AB reports that a 600 MW generator that tripped offline has caused an overload of a 345/138/13KV Inter-tie Transformer Bank. You realize that if the overloaded transformer trips off line, it would create an IROL. There are several Interchange Transactions that have parallel flows that are flowing through that transformer. What should you do? -Answer D. Issue a TLR on enough interchange transactions starting with the lowest priority and working up, until enough are curtailed to relieve the transformer from its overload condition.


Document information

Uploaded on
December 29, 2023
Number of pages
18
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AmazingGrace
4.1
(371)
Sold
1692
Followers
1193
Items
9247
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.