• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

CLM 017 Risk Management Exam

Document preview thumbnail
Preview 1 out of 4 pages

What would be the appropriate corrective action for the following issue: A major water leak has permanently damaged 45% of the servers used to control the cloud-based network infrastructure. This has been designated a high issue. - Answer- • Control The following describes which type of category of risk: Two legacy software systems must be combined into one system in order to operate a new piece of hardware. Programmers must find a way to ensure that old data records in each system are still editable. If not, the hardware will not operate correctly. - Answer- • Technical You are managing a base realignment program to consolidate four bases, while expanding/modernizing the? surviving? base. As part of that program, there is a requirement to reduce water run-off by 25% from both bases. You have heard from a colleague about a new water-permeable concrete that allows water infiltration at a rapid rate and lasts for up to 10 years. Is this a risk or an opportunity? - Answer- Opportunity A shortage of steel has caused a delay in one of the tasks until I the material is available. The original plan estimated the material to be available in 6 weeks, but the shortage continues. What would be an appropriate step to tracking and managing this issue? - Answer- • Adjust the corrective action plan and issue level as warranted. Who may write the Program Risk Process (PRP) Document? - Answer- • The program manager (PM) or a dedicated risk manager Which of the following is the difference between a risk and an issue? - Answer- A risk is the potential of occurring; an issue has occurred or is certain to occur. How many framing assumptions (FAs) should the typical program have? - Answer- • About 3-5 During Technology Maturation and Risk Reduction (TMRR), the goal is to primarily reduce which types of risk? (Select all that apply.) - Answer- • Integration • Technology • Engineering You have contracted a university research team to create a new optic lens as a part of your programs satellite system. Your group has never worked with this team before, and has included a new potential risk stemming from their development and testing procedures. What type of analysis could you use to identify and reduce specific risks from their processes? - Answer- • Process Risk Analysis Which of the following is a step of the Department of Defense (DoD) Risk Management


Document information

Uploaded on
December 29, 2023
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(367)
Sold
2173
Followers
1449
Items
60892
Last sold
22 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.