100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

UST Test Study Questions

Rating
-
Sold
-
Pages
40
Grade
A+
Uploaded on
21-11-2023
Written in
2023/2024

UST Test Study Questions

Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Course

Document information

Uploaded on
November 21, 2023
Number of pages
40
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

UST Test Study Questions And Answers | 160 Questions with
100% Correct Answers | Verified By Expert 2023 | 46 Pages
Best Defined Grade A+ Attained
1) The regulations to enforce compliance of underground storage tank systems in the state
are found in?

a.) Code of Federal Regulations, 40 CFR Part 281
b.) California Code of Regulations, Title 23, Chapter 16
c.) Code of Federal Regulations, 40 CFR Part 280
d.) California Code of Regulations, Title 23, Chapter 17 - Correct answer b.)
California Code of Regulations; Title 23, Chapter 16

2) By definition an "underground storage tank system" includes

a.) The tank, all connected piping and dispensers
b.) The tank, all connected piping, ancillary equipment and containment system
c.) Only the tank
d.) Only tanks totally beneath the surface of the ground - Correct answer b.) The
tank, all connected piping, ancillary equipment and containment system

3) (H&SC, Sec 25281(z))

4) Under-dispenser containment was required for all UST systems by ___________.

a.) December 31, 2003
b.) July 1, 1987
c.) January 1, 1984
d.) January 1, 2000 - Correct answer a.) December 31, 2003

5) CCR Title 23, Sec 2636(g)(C)

6) According to California Law, UST systems installed after July 1, 2003, require a one-time
ELD test to ensure that the tank is product tight...

a.) If the tank is located within one (1) mile of a public drinking water well
b.) If the tank is located within 1000 feet of a public drinking water well
c.) Unless the tank is equipped with secondary containment
d.) In all cases - Correct answer For ALL tanks before use (H&SC 25290.2 (I))
e.) In all cases

7) H&SC, Sec 25290.2(i)

8) The written report submitted to the local agency after an unauthorized release is
required to include the following except:

a.) Description of actions taken to stop the release
b.) Cause of the release
c.) Method of disposal of released product


[Type here] [Type here] [Type here]

, d.) Date on which the release was discovered - Correct answer b.) Cause of the
release

9) CCR Title 23, Sec 2652(c)

10) An unauthorized release which does not escape from secondary containment only
requires a record on the operator's monitoring reports provided:

A. It did not increase the hazard of fire
B. It did not cause any deterioration of the secondary containment
C. It was cleaned up within 8 hours of detection
D. All of the above - Correct answer D. All of the above

11) H&SC, Sec 25294

12) The annual monitoring certification may be performed by:

A. A person possessing the appropriate contractors licenses
B. An individual trained and certified by the manufacturer of the monitoring
equipment
C. A designated UST operator
D. A person who meets the requirements of both a and b - Correct answer
D. A person who meets the requirements of both a and b

13) CCR Title 23, Sec 2715(i)

14) The following is true of secondary containment testing, EXCEPT:

a.) Must be tested every 24 months
b.) Must be tested every 36 months
c.) Results must be submitted to the local agency within 30 days of testing
d.) Local agency must be notified 48 hours prior to testing - Correct answer a.) Must
be tested every 24 months

15) CCR Title 23, Sec 2637(a)

16) Records of cathodic protection system maintenance must be kept on file for
______________.

a.) 10 years
b.) 1.5 years
c.) 3 years
d.) 6.5 years - Correct answer d.) 6.5 years

17) CCR Title 23, Sec 2712(b)

18) Impressed current cathodic protection systems shall be inspected no less than every
___________ to ensure that they are in proper working order:

a.) 60 days
b.) 90 days


[Type here] [Type here] [Type here]

, c.) 30 days
d.) 120 days - Correct answer a.) 60 days

19) CCR Title 23, Sec 2635(a)(2)

20) Monthly monitoring data must be kept on file for _________________.

a.) 3 years
b.) 6.5 years
c.) 5 years
d.) For the life of the UST system - Correct answer a.) 3 years

21) CCR Title 23, Sec 2712(b)

22) By December 22, 1998, all automatic line leak detectors installed on single-walled
pressurized piping must be capable of:

a.) Restricting product flow
b.) Triggering an audible and visual alarm
c.) Shutting down the pumping system
d.) Shutting off the flow at the dispenser - Correct answer c.) Shutting down the
pumping system

23) CCR Title 23, Sec 2666(c)

24) When an automatic tank gauge is utilized for single-walled tank leak detection, it shall
generate a post-test hard copy data report of the following information, except:

a.) Liquid volume
b.) Fuel depth
c.) Outside air temperature
d.) Time and date of test - Correct answer c.) Outside air temperature

25) CCR Title 23, Sec 2643(b)(1)

26) If a UST system is utilizing an overfill alarm, the alarm must be triggered to alert the
transfer operator when the tank is no more than ___________ full

a.) 85%
b.) 95%
c.) 90%
d.) 80% - Correct answer c.) 90%

27) CCR Title 23, Sec 2635(b)(2)(A)

28) A service technician has performed calibration and maintenance on an ATG probe; this
maintenance record must be kept on file for ______________.

a.) 6.5 years
b.) 3 years
c.) 5 years


[Type here] [Type here] [Type here]

, d.) Life of the UST system - Correct answer c.) 5 years

29) CCR Title 23, Sec 2712(b)

30) An automatic tank gauge is utilized for leak detection of the ______________.

a.) Tank
b.) Tank and Piping
c.) Piping
d.) Interstitial space - Correct answer a.) Tank

31) CCR Title 23, Sec 2643(b)(1)

32) After completion of enhanced leak detection (ELD) test, the ELD test results must be
submitted to the _________________.

a.) The local agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency - Correct answer d.) To both the
SWRCB and the local agency

33) CCR Title 23, Sec 2644.1(a)(5)

34) Which agency approves a site-specific variance which allows for an alternative method
of construction or monitoring:

a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance Control
d.) The local agency - Correct answer a.) The Regional Water Quality Board

35) CCR Title 23, Sec 2681(a)

36) A permit to operate a UST system must have all of the following listed on the permit,
EXCEPT:

a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
c.) Permit expiration date
d.) Monitoring requirements - Correct answer b.) Name of the tank manufacturer and
tank capacity

37) CCR Title 23, Sec 2712(c)

38) All underground pressurized product piping shall have an automatic line leak detector
capable of detecting a 3-gallon per hour leak rate installed by______________.

a.) July 1, 2003
b.) November 9, 2004
c.) July 1, 2004


[Type here] [Type here] [Type here]
$25.48
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
SandraTech

Get to know the seller

Seller avatar
SandraTech The University of Cambridge
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
3 year
Number of followers
0
Documents
74
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions